Install EV Chargers in Quakertown, Pennsylvania

Install EV chargers or analyze a site in Quakertown, Pennsylvania. 15 existing public charging locations (5 DC fast, 10 Level 2). Free 0–100 profitability score on any Quakertown address from EV Data Map by Charge Rigs.

Quakertown, Pennsylvania is served by 15 public electric vehicle charging locations operating 48 individual chargers — an average of 3.2 chargers per site. Of those locations, 5 (33%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (67%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Quakertown is ChargePoint Network with 11 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 109 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Quakertown and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Quakertown

Quakertown, Pennsylvania stands out for its robust public charging infrastructure, with 15 locations heavily dominated by the ChargePoint Network, which operates 73% of these sites. This concentration offers potential operators insights into the reliability and pricing structures determined by a single network. Among the 5 DC fast charging sites, the average power output is a competitive 109 kW, with 20% reaching at least 150 kW, indicating a market that favors faster charging options. These dynamics suggest that new installations could benefit from higher-powered solutions, particularly in a landscape where 33% of public locations are dedicated to DC fast charging, fulfilling both immediate demand and longer-term growth potential in the EV sector.

Quakertown charging by the numbers

Locations
15
Chargers
48
DC Fast locations
5
Level 2 locations
10

DC fast share: 33% of locations. Level 2 share: 67%. Average chargers per site: 3.2. Average DC fast power: 109 kW.

Quakertown charging — local snapshot

Top operator share
ChargePoint Network runs 73% of public locations across 4 networks.
Average DC fast power
109 kW (fastest stall: 250 kW)
High-power share
20% of DC fast sites are 150 kW-class or higher
Mix
33% DC fast / 67% Level 2 across 15 locations
Estimated DC ports
23 fast-charging ports city-wide

Charging networks in Quakertown

The following operators run public charging in Quakertown, ranked by number of locations.

Featured charging locations in Quakertown

A selection of higher-power public charging locations across Quakertown, sorted by power level.

  1. Wawa - Tesla Supercharger — Quakertown, PA, 18951 (Tesla · DC Fast · 250 kW)
  2. Ciocca Ford of Quakertown — Quakertown, PA, 18951 (Blink Network · DC Fast · 120 kW)
  3. HYUNDAI QTOWN SERVICE — Quakertown, PA, 18951 (ChargePoint Network · DC Fast · 62.5 kW)
  4. HYUNDAI QTOWN NEWVEHICLE — Quakertown, PA, 18951 (ChargePoint Network · DC Fast · 62.5 kW)
  5. CIOCCA-ABB-NISS CIOCCA NISSAN — Quakertown, PA, 18951 (ChargePoint Network · DC Fast · 50 kW)
  6. St Lukes University - Upper Bucks Campus — Quakertown, PA, 18951 (Blink Network · Level 2 · 17.3 kW)
  7. Ciocca Nissan Quakertown — Quakertown, PA, 18951 (Non-Networked · Level 2 · 7.2 kW)
  8. QUAKERTOWN STATION 2 — Quakertown, PA, 18951 (ChargePoint Network · Level 2 · 6.5 kW)
  9. QUAKERTOWN STATION 5 — Quakertown, PA, 18951 (ChargePoint Network · Level 2 · 6.5 kW)
  10. RICHLAND TWP STATION 01 — Quakertown, PA, 18951 (ChargePoint Network · Level 2 · 6.5 kW)
  11. QUAKERTOWN STATION 3 — Quakertown, PA, 18951 (ChargePoint Network · Level 2 · 6.5 kW)
  12. QUAKERTOWN STATION 6 — Quakertown, PA, 18951 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Pennsylvania we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Quakertown specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Quakertown, Pennsylvania?
There are 15 public electric vehicle charging locations in Quakertown, Pennsylvania, with a combined 48 individual chargers. 5 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Quakertown?
ChargePoint Network operates the most public charging locations in Quakertown with 11 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Quakertown?
Level 2 EV chargers in Quakertown typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Quakertown?
Most Quakertown projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Pennsylvania state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Quakertown?
A typical commercial Level 2 installation in Quakertown energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Quakertown take to become profitable?
Payback in Quakertown depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage