Install EV Chargers in Horsham, Pennsylvania

Install EV chargers or analyze a site in Horsham, Pennsylvania. 18 existing public charging locations (1 DC fast, 17 Level 2). Free 0–100 profitability score on any Horsham address from EV Data Map by Charge Rigs.

Horsham, Pennsylvania is served by 18 public electric vehicle charging locations operating 41 individual chargers — an average of 2.3 chargers per site. Of those locations, 1 (6%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 17 (94%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Horsham is ChargePoint Network with 15 locations, followed by Non-Networked with 1. Average DC fast power across the city is approximately 120 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Horsham and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Horsham

Horsham, Pennsylvania, features a distinctive EV charging landscape dominated by ChargePoint Network, which accounts for 83% of the city's 18 public charging locations. This concentration on a single operator means that uptime and pricing are closely aligned with ChargePoint's offerings, presenting both opportunities and challenges for potential new site developers. With just one DC fast charging option, averaging 120 kW, Horsham's fast charging infrastructure is modest compared to national standards, making it imperative for new entrants to consider high-capacity options in the 150–350 kW range to attract drivers. This local mix of 6% fast chargers and the remainder Level 2 stations caters to diverse charging needs, positioning Horsham as an intriguing market for future expansion.

Horsham charging by the numbers

Locations
18
Chargers
41
DC Fast locations
1
Level 2 locations
17

DC fast share: 6% of locations. Level 2 share: 94%. Average chargers per site: 2.3. Average DC fast power: 120 kW.

Horsham charging — local snapshot

Top operator share
ChargePoint Network runs 83% of public locations across 4 networks.
Average DC fast power
120 kW (fastest stall: 120 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
6% DC fast / 94% Level 2 across 18 locations
Estimated DC ports
2 fast-charging ports city-wide

Charging networks in Horsham

The following operators run public charging in Horsham, ranked by number of locations.

Featured charging locations in Horsham

A selection of higher-power public charging locations across Horsham, sorted by power level.

  1. Chapman of Horsham — Horsham, PA, 19044 (RED_E · DC Fast · 120 kW)
  2. Chapman Ford of Horsham — Horsham, PA, 19044 (Non-Networked · Level 2 · 7.2 kW)
  3. Comfort Inn Horsham - Philadelphia — Horsham, PA, 19044 (UNIVERSAL · Level 2 · 7.2 kW)
  4. T14 STATION 5 — Horsham, PA, 19044 (ChargePoint Network · Level 2 · 6.5 kW)
  5. T14 STATION 4 — Horsham, PA, 19044 (ChargePoint Network · Level 2 · 6.5 kW)
  6. T14 STATION 3 — Horsham, PA, 19044 (ChargePoint Network · Level 2 · 6.5 kW)
  7. T14 STATION 6 — Horsham, PA, 19044 (ChargePoint Network · Level 2 · 6.5 kW)
  8. T14 STATION 2 — Horsham, PA, 19044 (ChargePoint Network · Level 2 · 6.5 kW)
  9. T14 STATION 7 — Horsham, PA, 19044 (ChargePoint Network · Level 2 · 6.5 kW)
  10. WSPT HORSHAM 455 BCD — Horsham, PA, 19044 (ChargePoint Network · Level 2 · 6.5 kW)
  11. WSPT HORSHAM 100 LAKESIDE DR — Horsham, PA, 19044 (ChargePoint Network · Level 2 · 6.5 kW)
  12. WSPT HORSHAM 200 GIBRALTAR — Horsham, PA, 19044 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Pennsylvania we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Horsham specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 17 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Horsham, Pennsylvania?
There are 18 public electric vehicle charging locations in Horsham, Pennsylvania, with a combined 41 individual chargers. 1 locations offer DC fast charging and 17 provide Level 2 charging.
What is the largest EV charging network in Horsham?
ChargePoint Network operates the most public charging locations in Horsham with 15 sites, followed by Non-Networked with 1 sites.
How much does it cost to install an EV charger in Horsham?
Level 2 EV chargers in Horsham typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Horsham?
Most Horsham projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Pennsylvania state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Horsham?
A typical commercial Level 2 installation in Horsham energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Horsham take to become profitable?
Payback in Horsham depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.