Install EV Chargers in Ambler, Pennsylvania

Install EV chargers or analyze a site in Ambler, Pennsylvania. 10 existing public charging locations (0 DC fast, 10 Level 2). Free 0–100 profitability score on any Ambler address from EV Data Map by Charge Rigs.

Ambler, Pennsylvania is served by 10 public electric vehicle charging locations operating 24 individual chargers — an average of 2.4 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Ambler is ChargePoint Network with 6 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Ambler and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Ambler

Ambler, Pennsylvania features a public charging landscape that is almost entirely comprised of Level 2 stations, with all 10 available sites catered by a single dominant network, ChargePoint. This concentration on ChargePoint, which manages 60% of the charging locations, enhances reliability but also highlights a significant gap in DC fast charging options—none currently exist in the city. This presents a unique opportunity for developers seeking to enter the market, as local EV drivers must leave Ambler for quick top-ups, underscoring the demand for diverse charging solutions. By analyzing traffic patterns and local demographics, EV Data Map can identify the most strategic locations for new DC fast chargers, tapping into an unmet need in the area.

Ambler charging by the numbers

Locations
10
Chargers
24
DC Fast locations
0
Level 2 locations
10

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 2.4. Average DC fast power: 0 kW.

Ambler charging — local snapshot

Top operator share
ChargePoint Network runs 60% of public locations across 3 networks.
Mix
0% DC fast / 100% Level 2 across 10 locations

Charging networks in Ambler

The following operators run public charging in Ambler, ranked by number of locations.

Featured charging locations in Ambler

A selection of higher-power public charging locations across Ambler, sorted by power level.

  1. Ambler Beverage Exchange — Ambler, PA, 19002 (Non-Networked · Level 2 · 7.2 kW)
  2. Weavers Way Co-op — Ambler, PA, 19002 (Non-Networked · Level 2 · 7.2 kW)
  3. Swtch Energy — Ambler, PA, 19002 (SWTCH · Level 2 · 7.2 kW)
  4. DenLee Music School — Ambler, PA, 19002 (Non-Networked · Level 2 · 7.2 kW)
  5. AMBLER POPLAR — Ambler, PA, 19002 (ChargePoint Network · Level 2 · 6.5 kW)
  6. 812 N BETHLEHEM STATION 3 — Ambler, PA, 19002 (ChargePoint Network · Level 2 · 6.5 kW)
  7. 812 N BETHLEHEM STATION 1 — Ambler, PA, 19002 (ChargePoint Network · Level 2 · 6.5 kW)
  8. 812 N BETHLEHEM STATION 6- REAR — Ambler, PA, 19002 (ChargePoint Network · Level 2 · 6.5 kW)
  9. 812 N BETHLEHEM STATION 2 — Ambler, PA, 19002 (ChargePoint Network · Level 2 · 6.5 kW)
  10. AMBLER RACE — Ambler, PA, 19002 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Pennsylvania we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Ambler specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Ambler, Pennsylvania?
There are 10 public electric vehicle charging locations in Ambler, Pennsylvania, with a combined 24 individual chargers. 0 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Ambler?
ChargePoint Network operates the most public charging locations in Ambler with 6 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Ambler?
Level 2 EV chargers in Ambler typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Ambler?
Most Ambler projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Pennsylvania state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Ambler?
A typical commercial Level 2 installation in Ambler energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Ambler take to become profitable?
Payback in Ambler depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.