Install EV Chargers in Scranton, Pennsylvania

Install EV chargers or analyze a site in Scranton, Pennsylvania. 10 existing public charging locations (2 DC fast, 8 Level 2). Free 0–100 profitability score on any Scranton address from EV Data Map by Charge Rigs.

Scranton, Pennsylvania is served by 10 public electric vehicle charging locations operating 29 individual chargers — an average of 2.9 chargers per site. Of those locations, 2 (20%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (80%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Scranton is ChargePoint Network with 6 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 375 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Scranton and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Scranton

Scranton, Pennsylvania features a well-defined charging landscape dominated by ChargePoint Network, which operates 60% of the city’s 10 public charging stations. With 20% of these dedicated to DC fast charging, the infrastructure boasts an impressive average power output of 375 kW, highlighting its capability to serve high-demand users efficiently. Every DC fast charger in Scranton is rated 150 kW or higher, positioning the city among the leaders in fast-charging options. This concentration under a single operator like ChargePoint enhances reliability but also suggests that new entrants with chargers in the 150–350 kW range could effectively compete by attracting drivers through their superior charging speed. With a strategic assessment, developers can identify untapped potential in this growing market.

Scranton charging by the numbers

Locations
10
Chargers
29
DC Fast locations
2
Level 2 locations
8

DC fast share: 20% of locations. Level 2 share: 80%. Average chargers per site: 2.9. Average DC fast power: 375 kW.

Scranton charging — local snapshot

Top operator share
ChargePoint Network runs 60% of public locations across 4 networks.
Average DC fast power
375 kW (fastest stall: 400 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
20% DC fast / 80% Level 2 across 10 locations
Estimated DC ports
14 fast-charging ports city-wide

Charging networks in Scranton

The following operators run public charging in Scranton, ranked by number of locations.

Featured charging locations in Scranton

A selection of higher-power public charging locations across Scranton, sorted by power level.

  1. Scranton, PA Rechargery @ Sheetz - Scranton Carbondale Hwy — Scranton, PA, 18508 (IONNA · DC Fast · 400 kW)
  2. Sheetz 662 (Scranton, PA) — Scranton, PA, 18503 (Electrify America · DC Fast · 350 kW)
  3. AAA North Penn — Scranton, PA, 18519 (Blink Network · Level 2 · 21.6 kW)
  4. Noble Biomaterials — Scranton, PA, 18505 (Blink Network · Level 2 · 10.8 kW)
  5. CDPS LINDEN GARAGE — Scranton, PA, 18503 (ChargePoint Network · Level 2 · 6.5 kW)
  6. CDPS CONNELL GARAGE — Scranton, PA, 18503 (ChargePoint Network · Level 2 · 6.5 kW)
  7. TOM HESSER BMW T.HESSER BMW 1 — Scranton, PA, 18509 (ChargePoint Network · Level 2 · 6.5 kW)
  8. TOYOTA OF SCR TOYOTA OF SCR — Scranton, PA, 18508 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CDPS MEDALLION GARAG — Scranton, PA, 18503 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CDPS CASEY GARAGE — Scranton, PA, 18503 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Pennsylvania we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Scranton specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Scranton, Pennsylvania?
There are 10 public electric vehicle charging locations in Scranton, Pennsylvania, with a combined 29 individual chargers. 2 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Scranton?
ChargePoint Network operates the most public charging locations in Scranton with 6 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Scranton?
Level 2 EV chargers in Scranton typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Scranton?
Most Scranton projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Pennsylvania state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Scranton?
A typical commercial Level 2 installation in Scranton energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Scranton take to become profitable?
Payback in Scranton depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage