Install EV Chargers in Anderson, South Carolina

Install EV chargers or analyze a site in Anderson, South Carolina. 16 existing public charging locations (9 DC fast, 7 Level 2). Free 0–100 profitability score on any Anderson address from EV Data Map by Charge Rigs.

Anderson, South Carolina is served by 16 public electric vehicle charging locations operating 39 individual chargers — an average of 2.4 chargers per site. Of those locations, 9 (56%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (44%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Anderson is ChargePoint Network with 10 locations, followed by EV Connect with 2. Average DC fast power across the city is approximately 167 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Anderson and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Anderson

Public charging in Anderson, South Carolina is dominated by ChargePoint Network, which runs 63% of the 16 public locations across the city. That concentration means uptime, pricing and network reliability hinge heavily on a single operator — a fact worth weighing when you plan a competing site. The 9 DC fast locations average 167 kW, with the fastest site at 350 kW. That is a modern high-power fleet by current US standards; 33% of DC fast sites are 150 kW-class or higher. New entrants pricing around 150–350 kW hardware will sit at the top of the local power curve, which matters for driver selection in nav apps. By mix, 56% of Anderson's public locations are DC fast and the rest serve longer-dwell Level 2 demand, with roughly 27 DC fast ports across the city. EV Data Map scores any Anderson address against this footprint and the surrounding traffic, demographics and grid context to surface the gaps worth filling first.

Anderson charging by the numbers

Locations
16
Chargers
39
DC Fast locations
9
Level 2 locations
7

DC fast share: 56% of locations. Level 2 share: 44%. Average chargers per site: 2.4. Average DC fast power: 167 kW.

Anderson charging — local snapshot

Top operator share
ChargePoint Network runs 63% of public locations across 6 networks.
Average DC fast power
167 kW (fastest stall: 350 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
56% DC fast / 44% Level 2 across 16 locations
Estimated DC ports
27 fast-charging ports city-wide

Charging networks in Anderson

The following operators run public charging in Anderson, ranked by number of locations.

Featured charging locations in Anderson

A selection of higher-power public charging locations across Anderson, sorted by power level.

  1. OPTIMUS CPO BTC ANDERSON 2 — Anderson, SC, 29624 (ChargePoint Network · DC Fast · 350 kW)
  2. OPTIMUS CPO BTC ANDERSON 1 — Anderson, SC, 29624 (ChargePoint Network · DC Fast · 350 kW)
  3. Hilton Garden Inn - Tesla Supercharger — Anderson, SC, 29621 (Tesla · DC Fast · 325 kW)
  4. AND POWER LINK 1 — Anderson, SC, 29621 (ChargePoint Network · DC Fast · 120 kW)
  5. 301 S Murray Ave — Anderson, SC, 29624 (EV Connect · DC Fast · 100 kW)
  6. AND POWER LINK 2 — Anderson, SC, 29621 (ChargePoint Network · DC Fast · 80 kW)
  7. HOA CHARGERS 1 HYUNDAI CHRGR 1 — Anderson, SC, 29621 (ChargePoint Network · DC Fast · 62.5 kW)
  8. HOA CHARGERS 1 HYUNDAI CHRGR 2 — Anderson, SC, 29621 (ChargePoint Network · DC Fast · 62.5 kW)
  9. GM - Richard Kay Cadillac — Anderson, SC, 29625 (EV Connect · DC Fast · 50 kW)
  10. Sadlers Creek State Park — Anderson, SC, 29626 (RIVIAN_WAYPOINTS · Level 2 · 11 kW)
  11. Anderson County - SC — Anderson, SC, 29625 (EVGATEWAY · Level 2 · 7.2 kW)
  12. The Bleckley Inn - Tesla Destination — Anderson, SC, 29624 (Tesla Destination · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in South Carolina we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Anderson specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 9 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Anderson, South Carolina?
There are 16 public electric vehicle charging locations in Anderson, South Carolina, with a combined 39 individual chargers. 9 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in Anderson?
ChargePoint Network operates the most public charging locations in Anderson with 10 sites, followed by EV Connect with 2 sites.
How much does it cost to install an EV charger in Anderson?
Level 2 EV chargers in Anderson typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Anderson?
Most Anderson projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with South Carolina state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Anderson?
A typical commercial Level 2 installation in Anderson energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Anderson take to become profitable?
Payback in Anderson depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage