Install EV chargers or analyze a site in Greenville, South Carolina. 74 existing public charging locations (14 DC fast, 60 Level 2). Free 0–100 profitability score on any Greenville address from EV Data Map by Charge Rigs.
Greenville, South Carolina is served by 74 public electric vehicle charging locations operating 220 individual chargers — an average of 3.0 chargers per site. Of those locations, 14 (19%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 60 (81%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Greenville is ChargePoint Network with 28 locations, followed by Non-Networked with 21. Average DC fast power across the city is approximately 154 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Greenville and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Greenville
Greenville stands out in the EV charging landscape with its diverse network of 74 public charging locations, featuring 14 DC fast charging sites that are among the most powerful in South Carolina, with an average output of 154 kW and a maximum of 350 kW. This modern infrastructure, where 43% of fast charging stations are classified at 150 kW or higher, positions the city as a competitive player for EV drivers seeking quick and efficient charging options. The presence of 13 distinct operators, led by ChargePoint Network at 38% of location share, fosters a dynamic market that incentivizes both competitive pricing and uptime, ultimately allowing drivers to choose chargers based on power specifications and amenities rather than brand loyalty.
Greenville charging by the numbers
Locations
74
Chargers
220
DC Fast locations
14
Level 2 locations
60
DC fast share: 19% of locations. Level 2 share: 81%. Average chargers per site: 3.0. Average DC fast power: 154 kW.
Greenville charging — local snapshot
Top operator share
ChargePoint Network runs 38% of public locations across 13 networks.
Average DC fast power
154 kW (fastest stall: 350 kW)
High-power share
43% of DC fast sites are 150 kW-class or higher
Mix
19% DC fast / 81% Level 2 across 74 locations
Estimated DC ports
64 fast-charging ports city-wide
Charging networks in Greenville
The following operators run public charging in Greenville, ranked by number of locations.
ChargePoint Network — 28 locations
Non-Networked — 21 locations
Blink Network — 7 locations
Tesla Destination — 5 locations
Tesla — 3 locations
eVgo Network — 3 locations
CHAEVI — 1 location
Electrify America — 1 location
Featured charging locations in Greenville
A selection of higher-power public charging locations across Greenville, sorted by power level.
Target Greenville #T1182 — Greenville, SC, 29607 (eVgo Network · DC Fast · 350 kW)
Sam's Club 8278 (Greenville, SC) — Greenville, SC, 29607 (Electrify America · DC Fast · 350 kW)
Cracker Barrel - Tesla Supercharger — Greenville, SC, 29607 (Tesla · DC Fast · 325 kW)
Greenville, SC — Greenville, SC, 29615 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
The Gallery - Tesla Supercharger — Greenville, SC, 29607 (Tesla · DC Fast · 250 kW)
Hilton Garden Inn Greenville - Tesla Supercharger — Greenville, SC, 29607 (Tesla · DC Fast · 150 kW)
Fairway Ford - 2323 Laurens Rd - DCFC — Greenville, SC, 29607 (Blink Network · DC Fast · 120 kW)
Clemson University - International Center for Automotive Research — Greenville, SC, 29607 (Non-Networked · DC Fast · 50 kW)
SPINX - Store #209 — Greenville, SC, 29605 (eVgo Network · DC Fast · 50 kW)
City of Greenville - Richardson Garage — Greenville, SC, 29601 (Non-Networked · DC Fast · 50 kW)
SPINX - Store #102 — Greenville, SC, 29607 (eVgo Network · DC Fast · 50 kW)
DSAGHYN SMITH HYUNDAI 2 — Greenville, SC, 29607 (ChargePoint Network · DC Fast · 50 kW)
Nearby cities with EV charging coverage
Other cities in South Carolina we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Greenville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 14 DC fast and 60 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Greenville, South Carolina?
There are 74 public electric vehicle charging locations in Greenville, South Carolina, with a combined 220 individual chargers. 14 locations offer DC fast charging and 60 provide Level 2 charging.
What is the largest EV charging network in Greenville?
ChargePoint Network operates the most public charging locations in Greenville with 28 sites, followed by Non-Networked with 21 sites.
How much does it cost to install an EV charger in Greenville?
Level 2 EV chargers in Greenville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Greenville?
Most Greenville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with South Carolina state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Greenville?
A typical commercial Level 2 installation in Greenville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Greenville take to become profitable?
Payback in Greenville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.