Install EV Chargers in Myrtle Beach, South Carolina
Install EV chargers or analyze a site in Myrtle Beach, South Carolina. 31 existing public charging locations (5 DC fast, 26 Level 2). Free 0–100 profitability score on any Myrtle Beach address from EV Data Map by Charge Rigs.
Myrtle Beach, South Carolina is served by 31 public electric vehicle charging locations operating 92 individual chargers — an average of 3.0 chargers per site. Of those locations, 5 (16%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 26 (84%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Myrtle Beach is Tesla Destination with 9 locations, followed by ChargePoint Network with 8. Average DC fast power across the city is approximately 157 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Myrtle Beach and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Myrtle Beach
Myrtle Beach features a dynamic public charging landscape with 31 locations supported by 9 different operators, ensuring competitive pricing and service uptime. Tesla Destination leads with 29% of the sites, but the presence of multiple networks allows drivers to choose based on power and amenities rather than brand loyalty. Notably, the 5 DC fast charging locations offer an impressive average power output of 161 kW, with 60% of these sites rated at 150 kW or higher, catering to the high-demand of modern EVs. The diversity and power of the infrastructure position Myrtle Beach as an attractive destination for EV drivers, making efficient use of the local grid while promoting a blend of fast and longer-dwell charging options throughout the city.
Myrtle Beach charging by the numbers
Locations
31
Chargers
92
DC Fast locations
5
Level 2 locations
26
DC fast share: 16% of locations. Level 2 share: 84%. Average chargers per site: 3.0. Average DC fast power: 157 kW.
Myrtle Beach charging — local snapshot
Top operator share
Tesla Destination runs 29% of public locations across 9 networks.
Average DC fast power
157 kW (fastest stall: 350 kW)
High-power share
60% of DC fast sites are 150 kW-class or higher
Mix
16% DC fast / 84% Level 2 across 31 locations
Estimated DC ports
22 fast-charging ports city-wide
Charging networks in Myrtle Beach
The following operators run public charging in Myrtle Beach, ranked by number of locations.
Tesla Destination — 9 locations
ChargePoint Network — 8 locations
Blink Network — 7 locations
Non-Networked — 2 locations
RIVIAN_WAYPOINTS — 1 location
Electrify America — 1 location
Tesla — 1 location
ENVIROSPARK — 1 location
Featured charging locations in Myrtle Beach
A selection of higher-power public charging locations across Myrtle Beach, sorted by power level.
CBL Coastal Grand Mall (Myrtle Beach, SC) — Myrtle Beach, SC, 29577 (Electrify America · DC Fast · 350 kW)
CircleK - Myrtle Beach, SC — Myrtle Beach, SC, 29579 (CIRCLE_K · DC Fast · 180 kW)
Coastal Grand Mall - Tesla Supercharger — Myrtle Beach, SC, 29577 (Tesla · DC Fast · 150 kW)
FALCON INVENTORY CHRG — Myrtle Beach, SC, 29577 (ChargePoint Network · DC Fast · 62.5 kW)
FALCON CUSTOMER CHARGE — Myrtle Beach, SC, 29577 (ChargePoint Network · DC Fast · 40 kW)
Haven at Coastal Exchange — Myrtle Beach, SC, 29577 (Blink Network · Level 2 · 13 kW)
Portside at Grande Dunes — Myrtle Beach, SC, 29572 (Blink Network · Level 2 · 12.7 kW)
Myrtle Beach State Park — Myrtle Beach, SC, 29575 (RIVIAN_WAYPOINTS · Level 2 · 11 kW)
Club Wyndham Seawatch South Tower Parking Garage — Myrtle Beach, SC, 29572 (Blink Network · Level 2 · 10.4 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Myrtle Beach specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 26 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Myrtle Beach, South Carolina?
There are 31 public electric vehicle charging locations in Myrtle Beach, South Carolina, with a combined 92 individual chargers. 5 locations offer DC fast charging and 26 provide Level 2 charging.
What is the largest EV charging network in Myrtle Beach?
Tesla Destination operates the most public charging locations in Myrtle Beach with 9 sites, followed by ChargePoint Network with 8 sites.
How much does it cost to install an EV charger in Myrtle Beach?
Level 2 EV chargers in Myrtle Beach typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Myrtle Beach?
Most Myrtle Beach projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with South Carolina state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Myrtle Beach?
A typical commercial Level 2 installation in Myrtle Beach energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Myrtle Beach take to become profitable?
Payback in Myrtle Beach depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.