Install EV Chargers in North Myrtle Beach, South Carolina

Install EV chargers or analyze a site in North Myrtle Beach, South Carolina. 10 existing public charging locations (4 DC fast, 5 Level 2). Free 0–100 profitability score on any North Myrtle Beach address from EV Data Map by Charge Rigs.

North Myrtle Beach, South Carolina is served by 10 public electric vehicle charging locations operating 28 individual chargers — an average of 2.8 chargers per site. Of those locations, 4 (40%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 5 (50%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in North Myrtle Beach is Blink Network with 3 locations, followed by Tesla Destination with 2. Average DC fast power across the city is approximately 160 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in North Myrtle Beach and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in North Myrtle Beach

North Myrtle Beach boasts a competitive landscape for EV charging, featuring ten public locations operated by six distinct networks. The diversity among operators, with Blink Network leading at 30% of sites, enhances pricing and uptime competitiveness, allowing drivers to choose based on power and amenities rather than brand loyalty. Notably, the city’s four DC fast charging stations average a robust 160 kW, with 75% rated at 150 kW or higher, making them suitable for quick top-ups. The availability of a fast charger rated at 250 kW positions North Myrtle Beach as a forward-thinking player in the EV infrastructure market, catering to both short and long-dwell charging needs in the region.

North Myrtle Beach charging by the numbers

Locations
10
Chargers
28
DC Fast locations
4
Level 2 locations
5

DC fast share: 40% of locations. Level 2 share: 50%. Average chargers per site: 2.8. Average DC fast power: 160 kW.

North Myrtle Beach charging — local snapshot

Top operator share
Blink Network runs 30% of public locations across 6 networks.
Average DC fast power
160 kW (fastest stall: 250 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
40% DC fast / 60% Level 2 across 10 locations
Estimated DC ports
17 fast-charging ports city-wide

Charging networks in North Myrtle Beach

The following operators run public charging in North Myrtle Beach, ranked by number of locations.

Featured charging locations in North Myrtle Beach

A selection of higher-power public charging locations across North Myrtle Beach, sorted by power level.

  1. Barefoot Landing - Tesla Supercharger — North Myrtle Beach, SC, 29582 (Tesla · DC Fast · 250 kW)
  2. CircleK - Myrtle Beach — North Myrtle Beach, SC, 29582 (CIRCLE_K · DC Fast · 180 kW)
  3. CircleK - North Myrtle Beach, SC — North Myrtle Beach, SC, 29582 (CIRCLE_K · DC Fast · 180 kW)
  4. East Coast Honda — North Myrtle Beach, SC, 29588 (Blink Network · DC Fast · 30 kW)
  5. Shoreham Towers II — North Myrtle Beach, SC, 29582 (Blink Network · Level 2 · 13.3 kW)
  6. 21 Main at North Beach - Tesla Destination — North Myrtle Beach, SC, 29582 (Tesla Destination · Level 2 · 7.2 kW)
  7. North Beach Plantation - Tesla Destination — North Myrtle Beach, SC, 29582 (Tesla Destination · Level 2 · 7.2 kW)
  8. NMB CITY HALL STATION 1 — North Myrtle Beach, SC, 29582 (ChargePoint Network · Level 2 · 6.5 kW)
  9. Beach Days and Fairways — North Myrtle Beach, SC, 29582 (Blink Network · Level 2 · 6.2 kW)
  10. Wyndham Towers on the Grove — North Myrtle Beach, SC, 29582 (Non-Networked · unknown · 1.4 kW)

Nearby cities with EV charging coverage

Other cities in South Carolina we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For North Myrtle Beach specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 5 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in North Myrtle Beach, South Carolina?
There are 10 public electric vehicle charging locations in North Myrtle Beach, South Carolina, with a combined 28 individual chargers. 4 locations offer DC fast charging and 5 provide Level 2 charging.
What is the largest EV charging network in North Myrtle Beach?
Blink Network operates the most public charging locations in North Myrtle Beach with 3 sites, followed by Tesla Destination with 2 sites.
How much does it cost to install an EV charger in North Myrtle Beach?
Level 2 EV chargers in North Myrtle Beach typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in North Myrtle Beach?
Most North Myrtle Beach projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with South Carolina state, utility and NEVI-funded programs.
How long does it take to install an EV charger in North Myrtle Beach?
A typical commercial Level 2 installation in North Myrtle Beach energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in North Myrtle Beach take to become profitable?
Payback in North Myrtle Beach depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage