Install EV Chargers in Cookeville, Tennessee

Install EV chargers or analyze a site in Cookeville, Tennessee. 13 existing public charging locations (5 DC fast, 8 Level 2). Free 0–100 profitability score on any Cookeville address from EV Data Map by Charge Rigs.

Cookeville, Tennessee is served by 13 public electric vehicle charging locations operating 38 individual chargers — an average of 2.9 chargers per site. Of those locations, 5 (38%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (62%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Cookeville is Non-Networked with 2 locations, followed by RIVIAN_WAYPOINTS with 2. Average DC fast power across the city is approximately 221 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Cookeville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Cookeville

Cookeville boasts a competitive EV charging landscape with 13 public locations across 10 distinct operators, making it distinctively nuanced for drivers. The city features an impressive 38% of its stations as DC fast chargers, delivering an average power of 221 kW, with many sites classed at 150 kW or higher, ensuring drivers have access to top-tier charging options. Notably, the fastest station reaching 350 kW positions Cookeville well for high-demand users, enhancing the charging experience and influencing driver choices. This diversity in power and brand allows for strategic site selection, encouraging users to prioritize performance over brand loyalty, ultimately enhancing the accessibility and appeal of the local EV ecosystem.

Cookeville charging by the numbers

Locations
13
Chargers
38
DC Fast locations
5
Level 2 locations
8

DC fast share: 38% of locations. Level 2 share: 62%. Average chargers per site: 2.9. Average DC fast power: 221 kW.

Cookeville charging — local snapshot

Top operator share
Non-Networked runs 15% of public locations across 10 networks.
Average DC fast power
221 kW (fastest stall: 350 kW)
High-power share
80% of DC fast sites are 150 kW-class or higher
Mix
38% DC fast / 62% Level 2 across 13 locations
Estimated DC ports
23 fast-charging ports city-wide

Charging networks in Cookeville

The following operators run public charging in Cookeville, ranked by number of locations.

Featured charging locations in Cookeville

A selection of higher-power public charging locations across Cookeville, sorted by power level.

  1. Sam's Club 4930 (Cookeville, TN) — Cookeville, TN, 38506 (Electrify America · DC Fast · 350 kW)
  2. Cookeville, TN — Cookeville, TN, 38501 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
  3. Ford of Cookeville — Cookeville, TN, 38501 (FORD_CHARGE · DC Fast · 240 kW)
  4. Jackson Plaza - Tesla Supercharger — Cookeville, TN, 38501 (Tesla · DC Fast · 150 kW)
  5. TTU TTU DC FAST 1 — Cookeville, TN, 38501 (ChargePoint Network · DC Fast · 62.5 kW)
  6. Cummins Falls State Park — Cookeville, TN, 38501 (RIVIAN_WAYPOINTS · Level 2 · 11 kW)
  7. Cookeville, TN - Shoppes at Eagle Point — Cookeville, TN, 38501 (RIVIAN_WAYPOINTS · Level 2 · 11 kW)
  8. TownePlace Suites by Marriott — Cookeville, TN, 38506 (Blink Network · Level 2 · 8.6 kW)
  9. Cookeville Nissan — Cookeville, TN, 38501 (Non-Networked · Level 2 · 7.2 kW)
  10. La Quinta Inn & Suites Cookeville - Tesla Destination — Cookeville, TN, 38506 (Tesla Destination · Level 2 · 7.2 kW)
  11. Home2 Suites By Hilton Cookeville — Cookeville, TN, 38501 (CHARGELAB · Level 2 · 6.7 kW)
  12. COOKEVILLEHONDA SHOP01 — Cookeville, TN, 38501 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Tennessee we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Cookeville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Cookeville, Tennessee?
There are 13 public electric vehicle charging locations in Cookeville, Tennessee, with a combined 38 individual chargers. 5 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Cookeville?
Non-Networked operates the most public charging locations in Cookeville with 2 sites, followed by RIVIAN_WAYPOINTS with 2 sites.
How much does it cost to install an EV charger in Cookeville?
Level 2 EV chargers in Cookeville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Cookeville?
Most Cookeville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Tennessee state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Cookeville?
A typical commercial Level 2 installation in Cookeville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Cookeville take to become profitable?
Payback in Cookeville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage