Install EV chargers or analyze a site in Murfreesboro, Tennessee. 28 existing public charging locations (3 DC fast, 25 Level 2). Free 0–100 profitability score on any Murfreesboro address from EV Data Map by Charge Rigs.
Murfreesboro, Tennessee is served by 28 public electric vehicle charging locations operating 84 individual chargers — an average of 3.0 chargers per site. Of those locations, 3 (11%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 25 (89%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Murfreesboro is ChargePoint Network with 12 locations, followed by Blink Network with 9. Average DC fast power across the city is approximately 171 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Murfreesboro and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Murfreesboro
Murfreesboro boasts a vibrant public charging ecosystem, featuring 28 locations managed by eight distinct operators, with ChargePoint Network leading the way at 43% of the sites. This competitive landscape ensures varied pricing and operational uptime, allowing drivers to choose based on power and amenities rather than brand loyalty. The three available DC fast charging sites, averaging 171 kW, reflect a modern fleet with the fastest stall reaching 250 kW, and 67% of these sites are classified as 150 kW or higher. With effective route planning and a strong mix of Level 2 charging options, Murfreesboro is positioned to meet diverse EV charging needs, supported by EV Data Map to identify and prioritize gaps in the infrastructure.
Murfreesboro charging by the numbers
Locations
28
Chargers
84
DC Fast locations
3
Level 2 locations
25
DC fast share: 11% of locations. Level 2 share: 89%. Average chargers per site: 3.0. Average DC fast power: 171 kW.
Murfreesboro charging — local snapshot
Top operator share
ChargePoint Network runs 43% of public locations across 8 networks.
Average DC fast power
171 kW (fastest stall: 250 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
11% DC fast / 89% Level 2 across 28 locations
Estimated DC ports
19 fast-charging ports city-wide
Charging networks in Murfreesboro
The following operators run public charging in Murfreesboro, ranked by number of locations.
ChargePoint Network — 12 locations
Blink Network — 9 locations
Tesla Destination — 2 locations
Tesla — 1 location
LOOP — 1 location
ELECTRIC_ERA — 1 location
ABM — 1 location
Non-Networked — 1 location
Featured charging locations in Murfreesboro
A selection of higher-power public charging locations across Murfreesboro, sorted by power level.
Target — Murfreesboro, TN, 37129 (Tesla · DC Fast · 250 kW)
Electric Era Charging Station — Murfreesboro, TN, 37129 (ELECTRIC_ERA · DC Fast · 200 kW)
MBORO HYU HYD L3 A FRONT — Murfreesboro, TN, 37130 (ChargePoint Network · DC Fast · 62.5 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Murfreesboro specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 25 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Murfreesboro, Tennessee?
There are 28 public electric vehicle charging locations in Murfreesboro, Tennessee, with a combined 84 individual chargers. 3 locations offer DC fast charging and 25 provide Level 2 charging.
What is the largest EV charging network in Murfreesboro?
ChargePoint Network operates the most public charging locations in Murfreesboro with 12 sites, followed by Blink Network with 9 sites.
How much does it cost to install an EV charger in Murfreesboro?
Level 2 EV chargers in Murfreesboro typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Murfreesboro?
Most Murfreesboro projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Tennessee state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Murfreesboro?
A typical commercial Level 2 installation in Murfreesboro energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Murfreesboro take to become profitable?
Payback in Murfreesboro depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.