Install EV Chargers in Burleson, Texas

Install EV chargers or analyze a site in Burleson, Texas. 11 existing public charging locations (4 DC fast, 7 Level 2). Free 0–100 profitability score on any Burleson address from EV Data Map by Charge Rigs.

Burleson, Texas is served by 11 public electric vehicle charging locations operating 29 individual chargers — an average of 2.6 chargers per site. Of those locations, 4 (36%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (64%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Burleson is ChargePoint Network with 7 locations, followed by Tesla with 1. Average DC fast power across the city is approximately 106 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Burleson and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Burleson

Burleson, Texas, showcases a concentrated charging landscape, with 64% of its 11 public charging locations operated by ChargePoint Network, emphasizing the importance of network reliability for new developers. The city features a balanced mix of charging options, where 36% are DC fast chargers, averaging 106 kW, and with a notable 25% in the 150 kW-class or higher, positioning them favorably in the local market. The presence of a high-performance fast charger at 325 kW highlights the potential for attracting drivers who prioritize quick top-ups. As neighboring cities like Arlington and Fort Worth develop their infrastructure, understanding Burleson's unique blend of access points and existing competition becomes crucial for site strategists eyeing the evolving EV landscape.

Burleson charging by the numbers

Locations
11
Chargers
29
DC Fast locations
4
Level 2 locations
7

DC fast share: 36% of locations. Level 2 share: 64%. Average chargers per site: 2.6. Average DC fast power: 106 kW.

Burleson charging — local snapshot

Top operator share
ChargePoint Network runs 64% of public locations across 5 networks.
Average DC fast power
106 kW (fastest stall: 325 kW)
High-power share
25% of DC fast sites are 150 kW-class or higher
Mix
36% DC fast / 64% Level 2 across 11 locations
Estimated DC ports
15 fast-charging ports city-wide

Charging networks in Burleson

The following operators run public charging in Burleson, ranked by number of locations.

Featured charging locations in Burleson

A selection of higher-power public charging locations across Burleson, sorted by power level.

  1. Rudy's Country Store & BBQ - Tesla Supercharger — Burleson, TX, 76028 (Tesla · DC Fast · 325 kW)
  2. Cracker Barrel — Burleson, TX, 76028 (eVgo Network · DC Fast · 50 kW)
  3. Nissan - Burleson — Burleson, TX, 76028 (IN_CHARGE · DC Fast · 24 kW)
  4. STAMPEDE HD DCFAST HOG — Burleson, TX, 76028 (ChargePoint Network · DC Fast · 24 kW)
  5. HILEY MAZDA BUR MAZDA SHOP — Burleson, TX, 76028 (ChargePoint Network · Level 2 · 12 kW)
  6. Nissan - Burleson — Burleson, TX, 76028 (Non-Networked · Level 2 · 7.2 kW)
  7. CT4000 BUR PUBLIC CHAR — Burleson, TX, 76028 (ChargePoint Network · Level 2 · 6.5 kW)
  8. FVC200HMRES STATION 1 — Burleson, TX, 76028 (ChargePoint Network · Level 2 · 6.5 kW)
  9. FVC200HMRES STATION 3 — Burleson, TX, 76028 (ChargePoint Network · Level 2 · 6.5 kW)
  10. HMB HOSPITALITY FAIRFIELD INN — Burleson, TX, 76028 (ChargePoint Network · Level 2 · 6.5 kW)
  11. FVC200HMRES STATION 4 — Burleson, TX, 76028 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Texas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Burleson specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Burleson, Texas?
There are 11 public electric vehicle charging locations in Burleson, Texas, with a combined 29 individual chargers. 4 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in Burleson?
ChargePoint Network operates the most public charging locations in Burleson with 7 sites, followed by Tesla with 1 sites.
How much does it cost to install an EV charger in Burleson?
Level 2 EV chargers in Burleson typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Burleson?
Most Burleson projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Texas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Burleson?
A typical commercial Level 2 installation in Burleson energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Burleson take to become profitable?
Payback in Burleson depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.