Install EV Chargers in Carrollton, Texas

Install EV chargers or analyze a site in Carrollton, Texas. 17 existing public charging locations (3 DC fast, 14 Level 2). Free 0–100 profitability score on any Carrollton address from EV Data Map by Charge Rigs.

Carrollton, Texas is served by 17 public electric vehicle charging locations operating 45 individual chargers — an average of 2.6 chargers per site. Of those locations, 3 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Carrollton is ChargePoint Network with 8 locations, followed by Blink Network with 3. Average DC fast power across the city is approximately 168 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Carrollton and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Carrollton

Carrollton boasts a robust EV charging landscape with a unique mix of 17 public locations, highlighting the competitive dynamics fostered by seven distinct operators. ChargePoint Network dominates with 47% of sites, promoting a competitive environment that encourages variety in pricing and uptime. The city's three DC fast charging locations average a powerful 168 kW, with an impressive stall reaching up to 300 kW, positioning Carrollton’s infrastructure at the forefront of high-power offerings. Notably, 67% of these fast charging stations exceed 150 kW, catering to the growing demand for rapid charging solutions. This strategic blend of fast and Level 2 chargers enables drivers to optimize their charging experience based on power needs and amenities, setting Carrollton apart in the regional EV market.

Carrollton charging by the numbers

Locations
17
Chargers
45
DC Fast locations
3
Level 2 locations
14

DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 2.6. Average DC fast power: 168 kW.

Carrollton charging — local snapshot

Top operator share
ChargePoint Network runs 47% of public locations across 7 networks.
Average DC fast power
168 kW (fastest stall: 300 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
18% DC fast / 82% Level 2 across 17 locations
Estimated DC ports
13 fast-charging ports city-wide

Charging networks in Carrollton

The following operators run public charging in Carrollton, ranked by number of locations.

Featured charging locations in Carrollton

A selection of higher-power public charging locations across Carrollton, sorted by power level.

  1. Carrollton Station TX — Carrollton, TX, 75007 (RED_E · DC Fast · 300 kW)
  2. Sam Packs Five Star Ford Carollton - DCFC — Carrollton, TX, 75006 (Blink Network · DC Fast · 180 kW)
  3. MAVHARLEY DCFAST HOG — Carrollton, TX, 75006 (ChargePoint Network · DC Fast · 24 kW)
  4. Texas Hot Rides — Carrollton, TX, 75006 (NOODOE · Level 2 · 19 kW)
  5. Sam Packs Five Star Ford Carollton - Series — Carrollton, TX, 75006 (Blink Network · Level 2 · 16.6 kW)
  6. Carrier Enterprise HQ — Carrollton, TX, 75006 (Blink Network · Level 2 · 8.6 kW)
  7. Keystone at Castle Hills — Carrollton, TX, 75010 (LOOP · Level 2 · 7.7 kW)
  8. Wonderland Montessori Academy of Carrollton - Tesla Destination — Carrollton, TX, 75010 (Tesla Destination · Level 2 · 7.2 kW)
  9. Dallas Makerspace - Tesla Destination — Carrollton, TX, 75006 (Tesla Destination · Level 2 · 7.2 kW)
  10. SAVI HQ - Carrollton, TX — Carrollton, TX, 75006 (EVRANGE · Level 2 · 6.7 kW)
  11. OBE EVIVA TRINITY 1 — Carrollton, TX, 75006 (ChargePoint Network · Level 2 · 6.5 kW)
  12. INDIAN CREEK SIC-1 — Carrollton, TX, 75010 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Texas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Carrollton specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Carrollton, Texas?
There are 17 public electric vehicle charging locations in Carrollton, Texas, with a combined 45 individual chargers. 3 locations offer DC fast charging and 14 provide Level 2 charging.
What is the largest EV charging network in Carrollton?
ChargePoint Network operates the most public charging locations in Carrollton with 8 sites, followed by Blink Network with 3 sites.
How much does it cost to install an EV charger in Carrollton?
Level 2 EV chargers in Carrollton typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Carrollton?
Most Carrollton projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Texas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Carrollton?
A typical commercial Level 2 installation in Carrollton energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Carrollton take to become profitable?
Payback in Carrollton depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage