Install EV Chargers in Farmers Branch, Texas

Install EV chargers or analyze a site in Farmers Branch, Texas. 12 existing public charging locations (0 DC fast, 12 Level 2). Free 0–100 profitability score on any Farmers Branch address from EV Data Map by Charge Rigs.

Farmers Branch, Texas is served by 12 public electric vehicle charging locations operating 25 individual chargers — an average of 2.1 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 12 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Farmers Branch is ChargePoint Network with 11 locations, followed by Blink Network with 1. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Farmers Branch and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Farmers Branch

Farmers Branch, Texas presents a unique environment for EV charging with its exclusive reliance on Level 2 charging, providing no DC fast options for drivers in need of a quick recharge. With 12 public charging locations, all managed by ChargePoint Network, which operates 92% of these sites, the city's charging infrastructure is heavily centralized. This concentration offers potential challenges for reliability and pricing, making it essential for site developers to consider the dominance of a single operator. The absence of DC fast chargers represents a significant opportunity for growth, as local EV drivers currently face a gap in quick-charging options, effectively compelling them to venture outside the city for a fast top-up.

Farmers Branch charging by the numbers

Locations
12
Chargers
25
DC Fast locations
0
Level 2 locations
12

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 2.1. Average DC fast power: 0 kW.

Farmers Branch charging — local snapshot

Top operator share
ChargePoint Network runs 92% of public locations across 2 networks.
Mix
0% DC fast / 100% Level 2 across 12 locations

Charging networks in Farmers Branch

The following operators run public charging in Farmers Branch, ranked by number of locations.

Featured charging locations in Farmers Branch

A selection of higher-power public charging locations across Farmers Branch, sorted by power level.

  1. DD Mercer Pkwy LLC 392 — Farmers Branch, TX, 75234 (Blink Network · Level 2 · 16.6 kW)
  2. FARMERS BRANCH JUSTICE 1-DUAL — Farmers Branch, TX, 75244 (ChargePoint Network · Level 2 · 6.5 kW)
  3. CHATEAU DEVILLE CD - 1 — Farmers Branch, TX, 75244 (ChargePoint Network · Level 2 · 6.5 kW)
  4. FARMERS BRANCH REC 2-DUAL — Farmers Branch, TX, 75234 (ChargePoint Network · Level 2 · 6.5 kW)
  5. FARMERS BRANCH REC 1-DUAL — Farmers Branch, TX, 75234 (ChargePoint Network · Level 2 · 6.5 kW)
  6. LAKEVIEW LPS 1 — Farmers Branch, TX, 75244 (ChargePoint Network · Level 2 · 6.5 kW)
  7. HAMPTON FB DUAL HISFB — Farmers Branch, TX, 75234 (ChargePoint Network · Level 2 · 6.5 kW)
  8. FARMERS BRANCH MANSKE LIBRARY — Farmers Branch, TX, 75234 (ChargePoint Network · Level 2 · 6.5 kW)
  9. PARKSIDE VP-1 — Farmers Branch, TX, 75244 (ChargePoint Network · Level 2 · 6.5 kW)
  10. FARMERS BRANCH CH 3-DUAL — Farmers Branch, TX, 75234 (ChargePoint Network · Level 2 · 6.5 kW)
  11. FARMERS BRANCH CITY HALL - 2 — Farmers Branch, TX, 75234 (ChargePoint Network · Level 2 · 6.5 kW)
  12. FARMERS BRANCH CITY HALL - 1 — Farmers Branch, TX, 75234 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Texas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Farmers Branch specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 12 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Farmers Branch, Texas?
There are 12 public electric vehicle charging locations in Farmers Branch, Texas, with a combined 25 individual chargers. 0 locations offer DC fast charging and 12 provide Level 2 charging.
What is the largest EV charging network in Farmers Branch?
ChargePoint Network operates the most public charging locations in Farmers Branch with 11 sites, followed by Blink Network with 1 sites.
How much does it cost to install an EV charger in Farmers Branch?
Level 2 EV chargers in Farmers Branch typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Farmers Branch?
Most Farmers Branch projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Texas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Farmers Branch?
A typical commercial Level 2 installation in Farmers Branch energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Farmers Branch take to become profitable?
Payback in Farmers Branch depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.