Install EV Chargers in Pflugerville, Texas

Install EV chargers or analyze a site in Pflugerville, Texas. 11 existing public charging locations (3 DC fast, 8 Level 2). Free 0–100 profitability score on any Pflugerville address from EV Data Map by Charge Rigs.

Pflugerville, Texas is served by 11 public electric vehicle charging locations operating 34 individual chargers — an average of 3.1 chargers per site. Of those locations, 3 (27%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (73%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Pflugerville is ChargePoint Network with 5 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 180 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Pflugerville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Pflugerville

Pflugerville stands out in the EV charging landscape with its competitive mix of 11 public charging locations operated by six distinct networks, ensuring a range of options for drivers. With ChargePoint Network leading at 45% of the sites, this diversity promotes competitive pricing and robust uptime while allowing users to choose their charging station based on power and amenities. The city's three DC fast charging locations average 180 kW, with 67% of them featuring fast charging capabilities of 150 kW or more, making them attractive for high-demand users. This high-power infrastructure, complemented by Level 2 options, creates a dynamic charging ecosystem that supports both short and longer dwell times, perfect for Pflugerville’s growing EV community.

Pflugerville charging by the numbers

Locations
11
Chargers
34
DC Fast locations
3
Level 2 locations
8

DC fast share: 27% of locations. Level 2 share: 73%. Average chargers per site: 3.1. Average DC fast power: 180 kW.

Pflugerville charging — local snapshot

Top operator share
ChargePoint Network runs 45% of public locations across 6 networks.
Average DC fast power
180 kW (fastest stall: 350 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
27% DC fast / 73% Level 2 across 11 locations
Estimated DC ports
11 fast-charging ports city-wide

Charging networks in Pflugerville

The following operators run public charging in Pflugerville, ranked by number of locations.

Featured charging locations in Pflugerville

A selection of higher-power public charging locations across Pflugerville, sorted by power level.

  1. Target Pflugerville #T2495 — Pflugerville, TX, 78660 (eVgo Network · DC Fast · 350 kW)
  2. 1909 Kelly Ln — Pflugerville, TX, 78660 (SHELL_RECHARGE · DC Fast · 180 kW)
  3. Best Western Pflugerville — Pflugerville, TX, 78660 (GRAVITI_ENERGY · DC Fast · 9.6 kW)
  4. [325545] STRR Stone Hill Town Center — Pflugerville, TX, 78660 (Blink Network · Level 2 · 17.3 kW)
  5. [029548] STRR FM 1825 — Pflugerville, TX, 78660 (Blink Network · Level 2 · 17.3 kW)
  6. Austin 1 — Pflugerville, TX, 78660 (AMPUP · Level 2 · 7.2 kW)
  7. NORTHTOWN EV STATION2 — Pflugerville, TX, 78660 (ChargePoint Network · Level 2 · 6.5 kW)
  8. PIE AE AE NORTHEAST — Pflugerville, TX, 78660 (ChargePoint Network · Level 2 · 6.5 kW)
  9. NORAM STATION 2 — Pflugerville, TX, 78660 (ChargePoint Network · Level 2 · 6.5 kW)
  10. NORTHTOWN EV STATION1 — Pflugerville, TX, 78660 (ChargePoint Network · Level 2 · 6.5 kW)
  11. NORAM STATION 1 — Pflugerville, TX, 78660 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Texas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Pflugerville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Pflugerville, Texas?
There are 11 public electric vehicle charging locations in Pflugerville, Texas, with a combined 34 individual chargers. 3 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Pflugerville?
ChargePoint Network operates the most public charging locations in Pflugerville with 5 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Pflugerville?
Level 2 EV chargers in Pflugerville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Pflugerville?
Most Pflugerville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Texas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Pflugerville?
A typical commercial Level 2 installation in Pflugerville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Pflugerville take to become profitable?
Payback in Pflugerville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.