Install EV Chargers in Georgetown, Texas

Install EV chargers or analyze a site in Georgetown, Texas. 11 existing public charging locations (5 DC fast, 6 Level 2). Free 0–100 profitability score on any Georgetown address from EV Data Map by Charge Rigs.

Georgetown, Texas is served by 11 public electric vehicle charging locations operating 38 individual chargers — an average of 3.5 chargers per site. Of those locations, 5 (45%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (55%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Georgetown is ChargePoint Network with 6 locations, followed by EV Connect with 2. Average DC fast power across the city is approximately 147 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Georgetown and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Georgetown

Georgetown, Texas features a competitive public EV charging landscape with 11 locations serviced by 5 different operators, notably anchored by ChargePoint Network, which holds 55% of the sites. This diversity promotes competitive pricing and service reliability, allowing drivers to make informed choices based on charging power and amenities rather than being tied to a single brand. With an average DC fast charging output of 142 kW—60% of which are rated at 150 kW or higher—Georgetown caters well to fast-charging needs, particularly with its fastest stall at 250 kW. As demand grows, the strategic mix of DC fast and Level 2 options positions the city to effectively support various EV drivers and enhance its overall charging infrastructure.

Georgetown charging by the numbers

Locations
11
Chargers
38
DC Fast locations
5
Level 2 locations
6

DC fast share: 45% of locations. Level 2 share: 55%. Average chargers per site: 3.5. Average DC fast power: 147 kW.

Georgetown charging — local snapshot

Top operator share
ChargePoint Network runs 55% of public locations across 5 networks.
Average DC fast power
147 kW (fastest stall: 250 kW)
High-power share
60% of DC fast sites are 150 kW-class or higher
Mix
45% DC fast / 55% Level 2 across 11 locations
Estimated DC ports
21 fast-charging ports city-wide

Charging networks in Georgetown

The following operators run public charging in Georgetown, ranked by number of locations.

Featured charging locations in Georgetown

A selection of higher-power public charging locations across Georgetown, sorted by power level.

  1. Wolf Ranch Town Center - Tesla Supercharger — Georgetown, TX, 78628 (Tesla · DC Fast · 250 kW)
  2. Mac Haik Dodge Chrysler Jeep Georgetown — Georgetown, TX, 78626 (EV Connect · DC Fast · 180 kW)
  3. Mac Haik Georgetown Ford — Georgetown, TX, 78626 (EV Connect · DC Fast · 180 kW)
  4. TXB #65 STATION 2 — Georgetown, TX, 78628 (ChargePoint Network · DC Fast · 62 kW)
  5. TXB #65 STATION 1 — Georgetown, TX, 78628 (ChargePoint Network · DC Fast · 62 kW)
  6. Mercedes-Benz of Georgetown — Georgetown, TX, 78626 (Non-Networked · Level 2 · 7.2 kW)
  7. Allora Georgetown — Georgetown, TX, 78626 (Blink Network · Level 2 · 6.7 kW)
  8. THE GABRIEL NORTH — Georgetown, TX, 78628 (ChargePoint Network · Level 2 · 6.5 kW)
  9. THE GABRIEL SOUTH — Georgetown, TX, 78628 (ChargePoint Network · Level 2 · 6.5 kW)
  10. THE GABRIEL CENTRAL — Georgetown, TX, 78628 (ChargePoint Network · Level 2 · 6.5 kW)
  11. MAZDA GEORGETOW MAZDA GEORGETOW — Georgetown, TX, 78626 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Texas we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Georgetown specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Georgetown, Texas?
There are 11 public electric vehicle charging locations in Georgetown, Texas, with a combined 38 individual chargers. 5 locations offer DC fast charging and 6 provide Level 2 charging.
What is the largest EV charging network in Georgetown?
ChargePoint Network operates the most public charging locations in Georgetown with 6 sites, followed by EV Connect with 2 sites.
How much does it cost to install an EV charger in Georgetown?
Level 2 EV chargers in Georgetown typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Georgetown?
Most Georgetown projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Texas state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Georgetown?
A typical commercial Level 2 installation in Georgetown energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Georgetown take to become profitable?
Payback in Georgetown depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.