Install EV chargers or analyze a site in Charlottesville, Virginia. 57 existing public charging locations (14 DC fast, 42 Level 2). Free 0–100 profitability score on any Charlottesville address from EV Data Map by Charge Rigs.
Charlottesville, Virginia is served by 57 public electric vehicle charging locations operating 136 individual chargers — an average of 2.4 chargers per site. Of those locations, 14 (25%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 42 (74%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Charlottesville is ChargePoint Network with 28 locations, followed by Tesla Destination with 7. Average DC fast power across the city is approximately 131 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Charlottesville and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Charlottesville
Charlottesville boasts a dynamic and competitive EV charging landscape, featuring 55 public locations managed by 12 distinct operators, with ChargePoint Network leading at 47% of the sites. The city's 14 DC fast charging stations present a strong average power rating of 131 kW, and nearly a third of these installations are at least 150 kW-class, catering to more demanding drivers. This diversity in charging options allows EV users to choose based on their power needs and amenities, promoting a more nuanced approach to site selection beyond brand loyalty. With a combined total of 44 DC fast ports, Charlottesville balances both rapid charging and longer-dwell Level 2 options, making it an ideal location for expanding EV infrastructure.
Charlottesville charging by the numbers
Locations
57
Chargers
136
DC Fast locations
14
Level 2 locations
42
DC fast share: 25% of locations. Level 2 share: 74%. Average chargers per site: 2.4. Average DC fast power: 131 kW.
Charlottesville charging — local snapshot
Top operator share
ChargePoint Network runs 49% of public locations across 12 networks.
Average DC fast power
131 kW (fastest stall: 350 kW)
High-power share
29% of DC fast sites are 150 kW-class or higher
Mix
25% DC fast / 75% Level 2 across 57 locations
Estimated DC ports
44 fast-charging ports city-wide
Charging networks in Charlottesville
The following operators run public charging in Charlottesville, ranked by number of locations.
ChargePoint Network — 28 locations
Tesla Destination — 7 locations
Non-Networked — 7 locations
Blink Network — 4 locations
Tesla — 3 locations
FLO — 2 locations
EVGATEWAY — 1 location
RED_E — 1 location
Featured charging locations in Charlottesville
A selection of higher-power public charging locations across Charlottesville, sorted by power level.
Target T1858 (Charlottesville, VA) — Charlottesville, VA, 22911 (Electrify America · DC Fast · 350 kW)
Wawa - Tesla Supercharger — Charlottesville, VA, 22901 (Tesla · DC Fast · 325 kW)
Wawa - Tesla Supercharger — Charlottesville, VA, 22901 (Tesla · DC Fast · 250 kW)
The Shops at Stonefield - Tesla Supercharger — Charlottesville, VA, 22901 (Tesla · DC Fast · 150 kW)
MILL CREEK MILL CREEK 2 — Charlottesville, VA, 22902 (ChargePoint Network · DC Fast · 125 kW)
MILL CREEK MILL CREEK 1 — Charlottesville, VA, 22902 (ChargePoint Network · DC Fast · 125 kW)
Malloy Ford of Charlottesville — Charlottesville, VA, 22901 (Blink Network · DC Fast · 120 kW)
ALBEMARLE FAST MIDDLE 2 — Charlottesville, VA, 22902 (ChargePoint Network · DC Fast · 62.5 kW)
ALBEMARLE FAST MIDDLE 3 — Charlottesville, VA, 22902 (ChargePoint Network · DC Fast · 62.5 kW)
MALLOYCHEVROLET CPE250 1 — Charlottesville, VA, 22901 (ChargePoint Network · DC Fast · 62.5 kW)
MALLOYCHEVROLET CPE250 2 — Charlottesville, VA, 22901 (ChargePoint Network · DC Fast · 62.5 kW)
University of Virginia - Central Grounds Garage — Charlottesville, VA, 22903 (Non-Networked · DC Fast · 50 kW)
Nearby cities with EV charging coverage
Other cities in Virginia we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Charlottesville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 14 DC fast and 42 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Charlottesville, Virginia?
There are 57 public electric vehicle charging locations in Charlottesville, Virginia, with a combined 136 individual chargers. 14 locations offer DC fast charging and 42 provide Level 2 charging.
What is the largest EV charging network in Charlottesville?
ChargePoint Network operates the most public charging locations in Charlottesville with 28 sites, followed by Tesla Destination with 7 sites.
How much does it cost to install an EV charger in Charlottesville?
Level 2 EV chargers in Charlottesville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Charlottesville?
Most Charlottesville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Virginia state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Charlottesville?
A typical commercial Level 2 installation in Charlottesville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Charlottesville take to become profitable?
Payback in Charlottesville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.