Install EV Chargers in Kennewick, Washington

Install EV chargers or analyze a site in Kennewick, Washington. 36 existing public charging locations (3 DC fast, 33 Level 2). Free 0–100 profitability score on any Kennewick address from EV Data Map by Charge Rigs.

Kennewick, Washington is served by 36 public electric vehicle charging locations operating 81 individual chargers — an average of 2.3 chargers per site. Of those locations, 3 (8%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 33 (92%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Kennewick is ChargePoint Network with 26 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 183 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Kennewick and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Kennewick

Kennewick, Washington, offers a distinctive public charging landscape where ChargePoint Network dominates, managing 72% of the city's 36 charging locations, ensuring a high level of network reliability. With 3 DC fast charging sites averaging 183 kW—including one peak station at 350 kW—Kennewick boasts a competitive fast charging infrastructure, where 67% of these sites feature power levels of 150 kW or higher. While only 8% of charging locations are DC fast, the significant presence of Level 2 stations complements longer dwell times for drivers. This combination of high-power fast chargers and a robust Level 2 network presents compelling opportunities for new site developers aiming to capture local EV demand amidst a concentrated network environment.

Kennewick charging by the numbers

Locations
36
Chargers
81
DC Fast locations
3
Level 2 locations
33

DC fast share: 8% of locations. Level 2 share: 92%. Average chargers per site: 2.3. Average DC fast power: 183 kW.

Kennewick charging — local snapshot

Top operator share
ChargePoint Network runs 72% of public locations across 8 networks.
Average DC fast power
183 kW (fastest stall: 350 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
8% DC fast / 92% Level 2 across 36 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in Kennewick

The following operators run public charging in Kennewick, ranked by number of locations.

Featured charging locations in Kennewick

A selection of higher-power public charging locations across Kennewick, sorted by power level.

  1. Kroger Fred Meyer 163 (Kennewick, WA) — Kennewick, WA, 99336 (Electrify America · DC Fast · 350 kW)
  2. Fred Meyer - Tesla Supercharger — Kennewick, WA, 99336 (Tesla · DC Fast · 150 kW)
  3. 2901 Southridge Blvd — Kennewick, WA, 99338 (CHARGELAB · DC Fast · 50 kW)
  4. Devfuzion 1 — Kennewick, WA, 99336 (CHARGELAB · Level 2 · 11 kW)
  5. 19th Ave Apts — Kennewick, WA, 99337 (Blink Network · Level 2 · 9.6 kW)
  6. Leskovar Mitsubishi — Kennewick, WA, 99336 (Non-Networked · Level 2 · 7.2 kW)
  7. Kennewick — Kennewick, WA, 99338 (FLO · Level 2 · 7.2 kW)
  8. Badger Mountain Vineyard & Powers Winery - Tesla Destination — Kennewick, WA, 99338 (Tesla Destination · Level 2 · 7.2 kW)
  9. Hampton Inn Kennewick at Southridge - Tesla Destination — Kennewick, WA, 99338 (Tesla Destination · Level 2 · 7.2 kW)
  10. MGMT GRP 10 WEST — Kennewick, WA, 99336 (ChargePoint Network · Level 2 · 6.5 kW)
  11. PM COMPUTER STATION C — Kennewick, WA, 99338 (ChargePoint Network · Level 2 · 6.5 kW)
  12. PM COMPUTER BLDG F SW — Kennewick, WA, 99338 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Washington we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Kennewick specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 33 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Kennewick, Washington?
There are 36 public electric vehicle charging locations in Kennewick, Washington, with a combined 81 individual chargers. 3 locations offer DC fast charging and 33 provide Level 2 charging.
What is the largest EV charging network in Kennewick?
ChargePoint Network operates the most public charging locations in Kennewick with 26 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Kennewick?
Level 2 EV chargers in Kennewick typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Kennewick?
Most Kennewick projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Washington state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Kennewick?
A typical commercial Level 2 installation in Kennewick energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Kennewick take to become profitable?
Payback in Kennewick depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage