Install EV Chargers in Sequim, Washington

Install EV chargers or analyze a site in Sequim, Washington. 13 existing public charging locations (1 DC fast, 12 Level 2). Free 0–100 profitability score on any Sequim address from EV Data Map by Charge Rigs.

Sequim, Washington is served by 13 public electric vehicle charging locations operating 29 individual chargers — an average of 2.2 chargers per site. Of those locations, 1 (8%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 12 (92%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Sequim is ChargePoint Network with 5 locations, followed by Non-Networked with 4. Average DC fast power across the city is approximately 150 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Sequim and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Sequim

Sequim stands out in the EV charging landscape with 13 public charging locations, featuring a noteworthy diversity of operators—five in total—ensuring competitive pricing and uptime. With ChargePoint Network as the largest provider at 38% of stations, drivers can select charging based on power and amenities rather than sticking to one brand. The city’s single DC fast charging station boasts a robust 150 kW output, aligning with the demands of modern EV users, while all such stations exceed this power class. As 8% of Sequim's public chargers are DC fast, the remainder caters to longer-dwell Level 2 needs, establishing a balanced charging ecosystem that enables drivers to optimize their experience.

Sequim charging by the numbers

Locations
13
Chargers
29
DC Fast locations
1
Level 2 locations
12

DC fast share: 8% of locations. Level 2 share: 92%. Average chargers per site: 2.2. Average DC fast power: 150 kW.

Sequim charging — local snapshot

Top operator share
ChargePoint Network runs 38% of public locations across 5 networks.
Average DC fast power
150 kW (fastest stall: 150 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
8% DC fast / 92% Level 2 across 13 locations
Estimated DC ports
8 fast-charging ports city-wide

Charging networks in Sequim

The following operators run public charging in Sequim, ranked by number of locations.

Featured charging locations in Sequim

A selection of higher-power public charging locations across Sequim, sorted by power level.

  1. Holiday Inn Express & Suites - Tesla Supercharger — Sequim, WA, 98382 (Tesla · DC Fast · 150 kW)
  2. NOLS LIBRARY - BACK — Sequim, WA, 98382 (ChargePoint Network · Level 2 · 15.4 kW)
  3. NOLS LIBRARY - FRONT — Sequim, WA, 98382 (ChargePoint Network · Level 2 · 15.4 kW)
  4. SALISH SEASONS SOUTH #1 — Sequim, WA, 98382 (ChargePoint Network · Level 2 · 11.5 kW)
  5. SALISH SEASONS NORTH #2 — Sequim, WA, 98382 (ChargePoint Network · Level 2 · 11.5 kW)
  6. SALISH SEASONS FRONT-1 — Sequim, WA, 98382 (ChargePoint Network · Level 2 · 11.5 kW)
  7. GreenHouse Inn by the Bay - Tesla Destination — Sequim, WA, 98382 (Tesla Destination · Level 2 · 7.2 kW)
  8. PUD Lot on Govan St. — Sequim, WA, 98382 (Blink Network · Level 2 · 7.2 kW)
  9. The Co-op Farm and Garden — Sequim, WA, 98382 (Non-Networked · Level 2 · 7.2 kW)
  10. Lost Mountain Lodge - Tesla Destination — Sequim, WA, 98382 (Tesla Destination · Level 2 · 7.2 kW)
  11. Nikola Broadband — Sequim, WA, 98382 (Non-Networked · Level 2 · 7.2 kW)
  12. Wild Birds Unlimited — Sequim, WA, 98382 (Non-Networked · Level 2 · 7 kW)

Nearby cities with EV charging coverage

Other cities in Washington we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Sequim specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 12 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Sequim, Washington?
There are 13 public electric vehicle charging locations in Sequim, Washington, with a combined 29 individual chargers. 1 locations offer DC fast charging and 12 provide Level 2 charging.
What is the largest EV charging network in Sequim?
ChargePoint Network operates the most public charging locations in Sequim with 5 sites, followed by Non-Networked with 4 sites.
How much does it cost to install an EV charger in Sequim?
Level 2 EV chargers in Sequim typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Sequim?
Most Sequim projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Washington state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Sequim?
A typical commercial Level 2 installation in Sequim energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Sequim take to become profitable?
Payback in Sequim depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage