Install EV Chargers in Oak Harbor, Washington

Install EV chargers or analyze a site in Oak Harbor, Washington. 15 existing public charging locations (0 DC fast, 15 Level 2). Free 0–100 profitability score on any Oak Harbor address from EV Data Map by Charge Rigs.

Oak Harbor, Washington is served by 15 public electric vehicle charging locations operating 17 individual chargers — an average of 1.1 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 15 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Oak Harbor is ChargePoint Network with 15 locations. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Oak Harbor and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Oak Harbor

In Oak Harbor, Washington, the charging landscape is uniquely defined by its total reliance on Level 2 infrastructure, with ChargePoint Network operating all 15 public locations. This singular network operator ensures consistent service and pricing but highlights a significant gap: the absence of any DC fast charging stations. As a result, residents and visitors seeking quick charge options are effectively forced to leave the city, presenting a clear opportunity for new developments focused on fast charging solutions. With no existing fast-charging infrastructure, site developers can capitalize on this unmet demand, positioning their offerings to serve drivers in a market eager for rapid top-up options.

Oak Harbor charging by the numbers

Locations
15
Chargers
17
DC Fast locations
0
Level 2 locations
15

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 1.1. Average DC fast power: 0 kW.

Oak Harbor charging — local snapshot

Top operator share
ChargePoint Network runs 100% of public locations.
Mix
0% DC fast / 100% Level 2 across 15 locations

Charging networks in Oak Harbor

The following operators run public charging in Oak Harbor, ranked by number of locations.

Featured charging locations in Oak Harbor

A selection of higher-power public charging locations across Oak Harbor, sorted by power level.

  1. DELAURENTIS INT AIRPORT — Oak Harbor, WA, 98277 (ChargePoint Network · Level 2 · 19.2 kW)
  2. DOCK STREET NEW DOCK STREET — Oak Harbor, WA, 98277 (ChargePoint Network · Level 2 · 6.5 kW)
  3. OAK HARBOR STATION 1 — Oak Harbor, WA, 98277 (ChargePoint Network · Level 2 · 6.5 kW)
  4. CAMAS FLATS STATION 11 — Oak Harbor, WA, 98277 (ChargePoint Network · Level 2 · 3.8 kW)
  5. CAMAS FLATS STATION 1 — Oak Harbor, WA, 98277 (ChargePoint Network · Level 2 · 3.8 kW)
  6. CAMAS FLATS STATION 2 — Oak Harbor, WA, 98277 (ChargePoint Network · Level 2 · 3.8 kW)
  7. CAMAS FLATS STATION 3 — Oak Harbor, WA, 98277 (ChargePoint Network · Level 2 · 3.8 kW)
  8. CAMAS FLATS STATION 4 — Oak Harbor, WA, 98277 (ChargePoint Network · Level 2 · 3.8 kW)
  9. CAMAS FLATS STATION 14 — Oak Harbor, WA, 98277 (ChargePoint Network · Level 2 · 3.8 kW)
  10. CAMAS FLATS STATION 12 — Oak Harbor, WA, 98277 (ChargePoint Network · Level 2 · 3.8 kW)
  11. CAMAS FLATS STATION 6 — Oak Harbor, WA, 98277 (ChargePoint Network · Level 2 · 3.8 kW)
  12. CAMAS FLATS STATION 7 — Oak Harbor, WA, 98277 (ChargePoint Network · Level 2 · 3.8 kW)

Nearby cities with EV charging coverage

Other cities in Washington we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Oak Harbor specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 15 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Oak Harbor, Washington?
There are 15 public electric vehicle charging locations in Oak Harbor, Washington, with a combined 17 individual chargers. 0 locations offer DC fast charging and 15 provide Level 2 charging.
What is the largest EV charging network in Oak Harbor?
ChargePoint Network operates the most public charging locations in Oak Harbor with 15 sites.
How much does it cost to install an EV charger in Oak Harbor?
Level 2 EV chargers in Oak Harbor typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Oak Harbor?
Most Oak Harbor projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Washington state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Oak Harbor?
A typical commercial Level 2 installation in Oak Harbor energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Oak Harbor take to become profitable?
Payback in Oak Harbor depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage