Install EV chargers or analyze a site in Eau Claire, Wisconsin. 22 existing public charging locations (7 DC fast, 15 Level 2). Free 0–100 profitability score on any Eau Claire address from EV Data Map by Charge Rigs.
Eau Claire, Wisconsin is served by 22 public electric vehicle charging locations operating 69 individual chargers — an average of 3.1 chargers per site. Of those locations, 7 (32%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 15 (68%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Eau Claire is ChargePoint Network with 7 locations, followed by ZEFNET with 3. Average DC fast power across the city is approximately 156 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Eau Claire and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Eau Claire
Eau Claire stands out with a diverse and competitive public EV charging landscape, featuring 22 locations operated by 10 distinct networks, led by ChargePoint Network at 32%. The city's seven DC fast charging sites average a robust 156 kW, with over half classified at 150 kW or higher, catering to the demand for quicker charging solutions. With the fastest stall reaching 350 kW, this modern infrastructure supports a range of user needs, encouraging EV drivers to prioritize power and amenities over a single brand. The balance of DC fast and Level 2 chargers provides flexibility for different charging habits, making Eau Claire an attractive hub for EV users navigating the region.
Eau Claire charging by the numbers
Locations
22
Chargers
69
DC Fast locations
7
Level 2 locations
15
DC fast share: 32% of locations. Level 2 share: 68%. Average chargers per site: 3.1. Average DC fast power: 156 kW.
Eau Claire charging — local snapshot
Top operator share
ChargePoint Network runs 32% of public locations across 10 networks.
Average DC fast power
156 kW (fastest stall: 350 kW)
High-power share
57% of DC fast sites are 150 kW-class or higher
Mix
32% DC fast / 68% Level 2 across 22 locations
Estimated DC ports
20 fast-charging ports city-wide
Charging networks in Eau Claire
The following operators run public charging in Eau Claire, ranked by number of locations.
ChargePoint Network — 7 locations
ZEFNET — 3 locations
Non-Networked — 2 locations
Blink Network — 2 locations
TURNONGREEN — 2 locations
Tesla Destination — 2 locations
FORD_CHARGE — 1 location
DIRT_ROAD — 1 location
Featured charging locations in Eau Claire
A selection of higher-power public charging locations across Eau Claire, sorted by power level.
Sam's Club 8185 (Eau Claire, WI) — Eau Claire, WI, 54701 (Electrify America · DC Fast · 350 kW)
Eau Claire Ford — Eau Claire, WI, 54701 (FORD_CHARGE · DC Fast · 240 kW)
City of Eau Claire — Eau Claire, WI, 54703 (ZEFNET · DC Fast · 180 kW)
Shoppes at Oakwood - Tesla Supercharger — Eau Claire, WI, 54701 (Tesla · DC Fast · 150 kW)
ONE CHARGING DC 1 — Eau Claire, WI, 54701 (ChargePoint Network · DC Fast · 62.5 kW)
ONE CHARGING DC2 — Eau Claire, WI, 54701 (ChargePoint Network · DC Fast · 62.5 kW)
29 Pines — Eau Claire, WI, 54703 (ZEFNET · DC Fast · 50 kW)
The Howard — Eau Claire, WI, 54701 (Blink Network · Level 2 · 16.6 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Eau Claire specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 15 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Eau Claire, Wisconsin?
There are 22 public electric vehicle charging locations in Eau Claire, Wisconsin, with a combined 69 individual chargers. 7 locations offer DC fast charging and 15 provide Level 2 charging.
What is the largest EV charging network in Eau Claire?
ChargePoint Network operates the most public charging locations in Eau Claire with 7 sites, followed by ZEFNET with 3 sites.
How much does it cost to install an EV charger in Eau Claire?
Level 2 EV chargers in Eau Claire typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Eau Claire?
Most Eau Claire projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Wisconsin state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Eau Claire?
A typical commercial Level 2 installation in Eau Claire energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Eau Claire take to become profitable?
Payback in Eau Claire depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.