Install EV chargers or analyze a site in Ashwaubenon, Wisconsin. 12 existing public charging locations (0 DC fast, 12 Level 2). Free 0–100 profitability score on any Ashwaubenon address from EV Data Map by Charge Rigs.
Ashwaubenon, Wisconsin is served by 12 public electric vehicle charging locations operating 16 individual chargers — an average of 1.3 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 12 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Ashwaubenon is ChargePoint Network with 12 locations. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Ashwaubenon and receive an instant ROI score, demand projection, and recommended charger configuration.
Ashwaubenon, Wisconsin, presents a unique opportunity in the EV charging landscape, as it relies entirely on ChargePoint Network for its 12 public charging locations, all of which are Level 2 stations. This singular reliance on a single operator ensures a uniform experience but also highlights a significant gap in fast-charging infrastructure, with no DC fast chargers available. For site developers, this creates a pressing demand for quick-charging solutions, as drivers seeking faster replenishment must currently venture outside the city. The absence of fast chargers in Ashwaubenon not only identifies a clear market need but also positions new entrants to capitalize on this unfulfilled demand while benefiting from a well-defined charging network.
DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 1.3. Average DC fast power: 0 kW.
The following operators run public charging in Ashwaubenon, ranked by number of locations.
A selection of higher-power public charging locations across Ashwaubenon, sorted by power level.
Other cities in Wisconsin we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Ashwaubenon specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 12 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.