Install EV Chargers in Ashwaubenon, Wisconsin

Install EV chargers or analyze a site in Ashwaubenon, Wisconsin. 12 existing public charging locations (0 DC fast, 12 Level 2). Free 0–100 profitability score on any Ashwaubenon address from EV Data Map by Charge Rigs.

Ashwaubenon, Wisconsin is served by 12 public electric vehicle charging locations operating 16 individual chargers — an average of 1.3 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 12 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Ashwaubenon is ChargePoint Network with 12 locations. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Ashwaubenon and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Ashwaubenon

Ashwaubenon, Wisconsin presents a unique landscape for EV charging, as it solely features 12 Level 2 public charging sites operated entirely by ChargePoint Network. This exclusive reliance on a single operator ensures consistent uptime and network reliability, but it highlights a critical gap: the complete absence of DC fast charging options. As local EV drivers seeking quick top-ups currently must venture beyond city limits, this presents a compelling opportunity for developers to introduce fast charging solutions to cater to the unmet demand. With a concentrated Level 2 service, addressing this deficit could significantly enhance the EV infrastructure, attracting both residents and visitors alike.

Ashwaubenon charging by the numbers

Locations
12
Chargers
16
DC Fast locations
0
Level 2 locations
12

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 1.3. Average DC fast power: 0 kW.

Ashwaubenon charging — local snapshot

Top operator share
ChargePoint Network runs 100% of public locations.
Mix
0% DC fast / 100% Level 2 across 12 locations

Charging networks in Ashwaubenon

The following operators run public charging in Ashwaubenon, ranked by number of locations.

Featured charging locations in Ashwaubenon

A selection of higher-power public charging locations across Ashwaubenon, sorted by power level.

  1. PROMENADEGB STATION 1 — Ashwaubenon, WI, 54304 (ChargePoint Network · Level 2 · 12 kW)
  2. PROMENADEGB STATION 5 — Ashwaubenon, WI, 54304 (ChargePoint Network · Level 2 · 12 kW)
  3. PROMENADEGB STATION 3 — Ashwaubenon, WI, 54304 (ChargePoint Network · Level 2 · 7.7 kW)
  4. PROMENADEGB STATION 4 — Ashwaubenon, WI, 54304 (ChargePoint Network · Level 2 · 7.7 kW)
  5. PROMENADEGB STATION 2 — Ashwaubenon, WI, 54304 (ChargePoint Network · Level 2 · 7.7 kW)
  6. WPS GBTC 1 — Ashwaubenon, WI, 54304 (ChargePoint Network · Level 2 · 6.5 kW)
  7. HY VEE ASHWAUBENON W — Ashwaubenon, WI, 54304 (ChargePoint Network · Level 2 · 6.5 kW)
  8. WPS WPSC GBSC — Ashwaubenon, WI, 54304 (ChargePoint Network · Level 2 · 6.5 kW)
  9. HY VEE ASHWAUBENON E — Ashwaubenon, WI, 54304 (ChargePoint Network · Level 2 · 6.5 kW)
  10. PROMENADEGB STATION 7 — Ashwaubenon, WI, 54304 (ChargePoint Network · Level 2 · 3.8 kW)
  11. PROMENADEGB STATION 6 — Ashwaubenon, WI, 54304 (ChargePoint Network · Level 2 · 3.8 kW)
  12. PROMENADEGB STATION 8 — Ashwaubenon, WI, 54304 (ChargePoint Network · Level 2 · 3.8 kW)

Nearby cities with EV charging coverage

Other cities in Wisconsin we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Ashwaubenon specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 12 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Ashwaubenon, Wisconsin?
There are 12 public electric vehicle charging locations in Ashwaubenon, Wisconsin, with a combined 16 individual chargers. 0 locations offer DC fast charging and 12 provide Level 2 charging.
What is the largest EV charging network in Ashwaubenon?
ChargePoint Network operates the most public charging locations in Ashwaubenon with 12 sites.
How much does it cost to install an EV charger in Ashwaubenon?
Level 2 EV chargers in Ashwaubenon typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Ashwaubenon?
Most Ashwaubenon projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Wisconsin state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Ashwaubenon?
A typical commercial Level 2 installation in Ashwaubenon energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Ashwaubenon take to become profitable?
Payback in Ashwaubenon depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage