Install EV chargers or analyze a site in Opelika, Alabama. 17 existing public charging locations (6 DC fast, 11 Level 2). Free 0–100 profitability score on any Opelika address from EV Data Map by Charge Rigs.

Opelika, Alabama is served by 17 public electric vehicle charging locations operating 29 individual chargers — an average of 1.7 chargers per site. Of those locations, 6 (35%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (65%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Opelika is ChargePoint Network with 14 locations, followed by EV Connect with 1. Average DC fast power across the city is approximately 175 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Opelika and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Opelika

Opelika, Alabama's public charging infrastructure is notable for its strong reliance on ChargePoint Network, which operates 82% of the city's 17 charging locations. This concentration ensures that site uptime and reliability are heavily influenced by a single operator, a factor that aspiring competitors should carefully assess. With 35% of these sites dedicated to DC fast charging, the city boasts an impressive average power output of 175 kW, with the fastest stall reaching 320 kW. The presence of multiple high-power chargers, particularly 33% of DC fast sites classified as 150 kW or higher, positions Opelika favorably for attracting EV drivers who prioritize quick charging options, thus highlighting strategic opportunities for new developments in the area.

Opelika charging by the numbers

Locations
17
Chargers
29
DC Fast locations
6
Level 2 locations
11

DC fast share: 35% of locations. Level 2 share: 65%. Average chargers per site: 1.7. Average DC fast power: 175 kW.

Opelika charging — local snapshot

Top operator share
ChargePoint Network runs 82% of public locations across 4 networks.
Average DC fast power
175 kW (fastest stall: 320 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
35% DC fast / 65% Level 2 across 17 locations
Estimated DC ports
6 fast-charging ports city-wide

Charging networks in Opelika

The following operators run public charging in Opelika, ranked by number of locations.

Featured charging locations in Opelika

A selection of higher-power public charging locations across Opelika, sorted by power level.

  1. OPTIMUS ENERGY OPELIKA BK 1 — Opelika, AL, 36804 (ChargePoint Network · DC Fast · 320 kW)
  2. OPTIMUS ENERGY OPELIKA BK 2 — Opelika, AL, 36804 (ChargePoint Network · DC Fast · 320 kW)
  3. OPELIKA POWER SPORTS PLEX #1 — Opelika, AL, 36801 (ChargePoint Network · DC Fast · 125 kW)
  4. OPELIKA POWER SPORTS PLEX #2 — Opelika, AL, 36801 (ChargePoint Network · DC Fast · 125 kW)
  5. OPTIMUS ENERGY OPELIKA BK 4 — Opelika, AL, 36804 (ChargePoint Network · DC Fast · 80 kW)
  6. OPTIMUS ENERGY OPELIKA BK 3 — Opelika, AL, 36804 (ChargePoint Network · DC Fast · 80 kW)
  7. Element Opelika (Auburn Hospitality) — Opelika, AL, 36801 (EV Connect · Level 2 · 19.2 kW)
  8. Factzz Financial Services Limited — Opelika, AL, 36801 (Non-Networked · Level 2 · 11 kW)
  9. La Quinta Inn & Suites by Wyndham Opelika Auburn - Tesla Destination — Opelika, AL, 36804 (Tesla Destination · Level 2 · 7.2 kW)
  10. OPELIKA POWER COURT HOUSE #1 — Opelika, AL, 36801 (ChargePoint Network · Level 2 · 6.5 kW)
  11. OPELIKA POWER OPELIKA DEPOT#1 — Opelika, AL, 36801 (ChargePoint Network · Level 2 · 6.5 kW)
  12. OPELIKA POWER COURT HOUSE #2 — Opelika, AL, 36801 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Alabama we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Opelika specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Opelika, Alabama?
There are 17 public electric vehicle charging locations in Opelika, Alabama, with a combined 29 individual chargers. 6 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Opelika?
ChargePoint Network operates the most public charging locations in Opelika with 14 sites, followed by EV Connect with 1 sites.
How much does it cost to install an EV charger in Opelika?
Level 2 EV chargers in Opelika typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Opelika?
Most Opelika projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Alabama state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Opelika?
A typical commercial Level 2 installation in Opelika energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Opelika take to become profitable?
Payback in Opelika depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.