Install EV Chargers in Avondale, Arizona

Install EV chargers or analyze a site in Avondale, Arizona. 27 existing public charging locations (2 DC fast, 25 Level 2). Free 0–100 profitability score on any Avondale address from EV Data Map by Charge Rigs.

Avondale, Arizona is served by 27 public electric vehicle charging locations operating 113 individual chargers — an average of 4.2 chargers per site. Of those locations, 2 (7%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 25 (93%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Avondale is ChargePoint Network with 19 locations, followed by Blink Network with 4. Average DC fast power across the city is approximately 175 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Avondale and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Avondale

Avondale, Arizona presents a unique opportunity for developers looking to enter its EV charging market, primarily dominated by a single operator, ChargePoint Network, which controls 70% of the 27 public locations. This concentration allows potential operators to consider competitive pricing and uptime strategies that directly impact driver experience. Notably, the city boasts a strong DC fast charging presence, with average power levels at 175 kW, and half of these sites rated at 150 kW-class or higher. Given the local demand for quick charging, new installations featuring 150-350 kW hardware may attract attention in driver navigation apps. With a strategic approach, operators can effectively utilize data insights from the surrounding area to identify and fill gaps in charging accessibility.

Avondale charging by the numbers

Locations
27
Chargers
113
DC Fast locations
2
Level 2 locations
25

DC fast share: 7% of locations. Level 2 share: 93%. Average chargers per site: 4.2. Average DC fast power: 175 kW.

Avondale charging — local snapshot

Top operator share
ChargePoint Network runs 70% of public locations across 6 networks.
Average DC fast power
175 kW (fastest stall: 325 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
7% DC fast / 93% Level 2 across 27 locations
Estimated DC ports
17 fast-charging ports city-wide

Charging networks in Avondale

The following operators run public charging in Avondale, ranked by number of locations.

Featured charging locations in Avondale

A selection of higher-power public charging locations across Avondale, sorted by power level.

  1. Main Event - Tesla Supercharger — Avondale, AZ, 85392 (Tesla · DC Fast · 325 kW)
  2. LHM1 DC WALLBOX 1 — Avondale, AZ, 85323 (ChargePoint Network · DC Fast · 24 kW)
  3. St. Thomas Aquinas Roman Catholic Parish Avondale — Avondale, AZ, 85392 (CHARGELAB · Level 2 · 19.2 kW)
  4. Avondale Center Residences - LIV — Avondale, AZ, 85323 (Blink Network · Level 2 · 10.4 kW)
  5. Avondale Center Residences — Avondale, AZ, 85323 (Blink Network · Level 2 · 10.4 kW)
  6. Rio Salado CC Avondale — Avondale, AZ, 85323 (Blink Network · Level 2 · 8.6 kW)
  7. Virtua 99th Hotel — Avondale, AZ, 85392 (Blink Network · Level 2 · 8.6 kW)
  8. Avondale Commons — Avondale, AZ, 85392 (EVOKE · Level 2 · 7.2 kW)
  9. City of Avondale — Avondale, AZ, 85323 (Non-Networked · Level 2 · 7.2 kW)
  10. VILLAG AT BLVD STATION 4 — Avondale, AZ, 85323 (ChargePoint Network · Level 2 · 6.5 kW)
  11. AVONDALE VISITR CENTER 1 — Avondale, AZ, 85323 (ChargePoint Network · Level 2 · 6.5 kW)
  12. AVONDALE RESOURCE CENTER — Avondale, AZ, 85323 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Arizona we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Avondale specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 25 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Avondale, Arizona?
There are 27 public electric vehicle charging locations in Avondale, Arizona, with a combined 113 individual chargers. 2 locations offer DC fast charging and 25 provide Level 2 charging.
What is the largest EV charging network in Avondale?
ChargePoint Network operates the most public charging locations in Avondale with 19 sites, followed by Blink Network with 4 sites.
How much does it cost to install an EV charger in Avondale?
Level 2 EV chargers in Avondale typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Avondale?
Most Avondale projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Arizona state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Avondale?
A typical commercial Level 2 installation in Avondale energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Avondale take to become profitable?
Payback in Avondale depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage