Public EV charging in Amherstburg, Ontario. 5 charging locations (1 DC fast, 4 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.
Amherstburg, Ontario is served by 5 public electric vehicle charging locations operating roughly 9 individual chargers. Of those, 1 (20%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 4 (80%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Amherstburg is ChargePoint Network with 4 locations, followed by Non-Networked with 1. Average DC fast power across the city is approximately 50 kW.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in Canada from 0 to 100 for DC Fast Charger ROI, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Amherstburg address below for an instant ROI score, demand projection, and recommended charger configuration — including ZEVIP, Ontario provincial, and utility incentive matching.
Amherstburg, Ontario, features a concentrated EV charging landscape with five public locations, predominantly supported by the ChargePoint Network, which accounts for 80% of the sites. This reliance on a single operator highlights the importance of network reliability and pricing consistency for prospective site developers. The city's only DC fast charging option, offering 50 kW, reflects an older infrastructure standard, making it vitally important for new entrants to bring in higher-capacity stations of 150 kW or more to entice drivers. With 20% of charging locations designated as DC fast, the remaining options cater to longer-dwell Level 2 needs, presenting an opportunity to enhance service and meet evolving EV user preferences in Amherstburg.
Other cities in Ontario we cover with full charging data and site profitability scoring.
Amherstburg projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Ontario provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.
Use the analyzer to see which programs apply to a specific Amherstburg address along with eligible award amounts.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Amherstburg specifically, our model factors local commute corridors, the existing footprint of 1 DC fast and 4 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.