Public EV charging in Acton Vale, Quebec. 6 charging locations (2 DC fast, 4 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.
Acton Vale, Quebec is served by 6 public electric vehicle charging locations operating roughly 8 individual chargers. Of those, 2 (33%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 4 (67%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Acton Vale is Circuit électrique with 4 locations, followed by FORD_CHARGE with 1. Average DC fast power across the city is approximately 110 kW.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in Canada from 0 to 100 for DC Fast Charger ROI, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Acton Vale address below for an instant ROI score, demand projection, and recommended charger configuration — including ZEVIP, Quebec provincial, and utility incentive matching.
Acton Vale’s public charging landscape presents a unique opportunity for developers due to its distinct reliance on Circuit électrique, which comprises 67% of the city's six charging sites. With merely 33% of these locations offering DC fast charging at an average of 110 kW, there exists a gap for higher-powered solutions, particularly as none of the fast chargers exceed 120 kW, a mid-tier performance by North American standards. This concentration on a single operator raises implications for pricing and network reliability, especially for potential competitors. Developers can strategically assess the local charging needs, particularly the demand for more robust DC fast chargers, to capture the market before surrounding regions like Drummondville and Granby expand their own offerings.
Other cities in Quebec we cover with full charging data and site profitability scoring.
Acton Vale projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Quebec provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.
Use the analyzer to see which programs apply to a specific Acton Vale address along with eligible award amounts.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Acton Vale specifically, our model factors local commute corridors, the existing footprint of 2 DC fast and 4 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.