EV Charging in Beaupré, Quebec

Public EV charging in Beaupré, Quebec. 6 charging locations (1 DC fast, 5 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.

Beaupré, Quebec is served by 6 public electric vehicle charging locations operating roughly 21 individual chargers. Of those, 1 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 5 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Beaupré is Circuit électrique with 2 locations, followed by FLO with 2. Average DC fast power across the city is approximately 100 kW.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in Canada from 0 to 100 for DC Fast Charger ROI, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Beaupré address below for an instant ROI score, demand projection, and recommended charger configuration — including ZEVIP, Quebec provincial, and utility incentive matching.

What to know about charging in Beaupré

Beaupré, Quebec boasts a blend of 6 public charging locations provided by 4 distinct networks, with Circuit électrique leading at 33%. This diverse operator landscape strikes a balance between competition and choice, enabling residents and visitors to access both Level 2 and DC fast charging options. While the single DC fast site offers a respectable average power of 100 kW, it remains static compared to newer, high-capacity 150–350 kW options proliferating elsewhere. As 17% of Beaupré’s public stations focus on fast charging, the majority still cater to longer-dwell Level 2 needs. Understanding this mix highlights appealing gaps in the market for potential developers and operators aiming to elevate the local charging infrastructure.

Beaupré charging by the numbers

Locations
6
Chargers
21
DC Fast locations
1
Level 2 locations
5

Beaupré charging — local snapshot

Top operator share
Circuit électrique runs 33% of public locations across 4 networks.
Average DC fast power
100 kW (fastest stall: 100 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 6 locations
Estimated DC ports
2 fast-charging ports city-wide

Charging networks in Beaupré

Featured charging locations in Beaupré

  1. BRCC - Beaupré - Couche-Tard — Beaupré, QC, G0A 1E0 (Circuit électrique · DC Fast · 100 kW)
  2. Delta Mont-Sainte-Anne — Beaupré, QC, G0A 1E0 (FLO · Level 2 · 16.6 kW)
  3. Chateau Mont-Sainte-Anne — Beaupre, QC, G0A 1E0 (Non-Networked · Level 2 · 7.2 kW)
  4. Chateau Mont-Ste-Anne - Tesla Destination — Beaupre, QC, G0A 1E0 (Tesla Destination · Level 2 · 7.2 kW)
  5. Delta Mont Saint-Anne - Phase 2 — Beaupré, QC, G0A 1E0 (FLO · Level 2 · 6.2 kW)
  6. Condominium Perce-Neige — Beaupré, QC, G0A 1E0 (Circuit électrique · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in Quebec we cover with full charging data and site profitability scoring.

Incentives for EV chargers in Quebec

Beaupré projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Quebec provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.

Use the analyzer to see which programs apply to a specific Beaupré address along with eligible award amounts.

How profitability scores work in Beaupré

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Beaupré specifically, our model factors local commute corridors, the existing footprint of 1 DC fast and 5 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Beaupré, Quebec?
There are 6 public EV charging locations in Beaupré, Quebec, with a combined 21 individual chargers. 1 locations offer DC fast charging and 5 provide Level 2 charging.
What incentives apply to EV chargers in Quebec?
Most Beaupré projects can stack the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) — covering up to 50% of project costs — with provincial Quebec programs and utility incentives. Class 56 accelerated CCA is also available for commercial charging hardware.
What is the largest EV charging network in Beaupré?
Circuit électrique operates the most public charging locations in Beaupré with 2 sites, followed by FLO with 2 sites.

Related coverage