Public EV charging in Boucherville, Quebec. 36 charging locations (6 DC fast, 30 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.
Boucherville, Quebec is served by 36 public electric vehicle charging locations operating roughly 126 individual chargers. Of those, 6 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 30 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Boucherville is Circuit électrique with 21 locations, followed by FLO with 9. Average DC fast power across the city is approximately 173 kW.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in Canada from 0 to 100 for DC Fast Charger ROI, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Boucherville address below for an instant ROI score, demand projection, and recommended charger configuration — including ZEVIP, Quebec provincial, and utility incentive matching.
Boucherville's public charging landscape distinguishes itself with a robust mix of five operators across 36 locations, fostering a competitive environment where pricing and uptime are optimized. Circuit électrique dominates with 58% of the sites, allowing for varied options that cater to specific driver preferences, particularly in power and amenities. With an impressive average DC fast charging power of 173 kW and 67% of these sites exceeding 150 kW, Boucherville is equipped with modern and efficient charging capabilities. This makes it particularly appealing for drivers seeking rapid charging options, especially as the fastest stall reaches 360 kW. The strategic layout reflects a thoughtful balance between high-power DC fast stations and accessible Level 2 chargers, ensuring comprehensive coverage for all EV needs.
Other cities in Quebec we cover with full charging data and site profitability scoring.
Boucherville projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Quebec provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.
Use the analyzer to see which programs apply to a specific Boucherville address along with eligible award amounts.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Boucherville specifically, our model factors local commute corridors, the existing footprint of 6 DC fast and 30 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.