EV Charging in Saint-Lambert, Quebec

Public EV charging in Saint-Lambert, Quebec. 6 charging locations (1 DC fast, 5 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.

Saint-Lambert, Quebec is served by 6 public electric vehicle charging locations operating roughly 13 individual chargers. Of those, 1 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 5 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Saint-Lambert is Circuit électrique with 5 locations, followed by FLO with 1. Average DC fast power across the city is approximately 360 kW.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in Canada from 0 to 100 for DC Fast Charger ROI, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Saint-Lambert address below for an instant ROI score, demand projection, and recommended charger configuration — including ZEVIP, Quebec provincial, and utility incentive matching.

What to know about charging in Saint-Lambert

In Saint-Lambert, Quebec, the charging landscape is defined by a strong presence of the Circuit électrique network, which manages 83% of the city's six public charging sites. This concentration enhances the reliability and familiarity for users but also poses a challenge for competing providers to differentiate themselves. Notably, the sole DC fast charging location boasts an impressive average power of 360 kW, positioning it among the most advanced in the region, with all fast sites exceeding 150 kW. While 17% of the charging options are DC fast stations, the majority cater to longer dwell times, highlighting a strategic opportunity for new installations focused on high-power charging to attract EV drivers seeking ultra-fast options.

Saint-Lambert charging by the numbers

Locations
6
Chargers
13
DC Fast locations
1
Level 2 locations
5

Saint-Lambert charging — local snapshot

Top operator share
Circuit électrique runs 83% of public locations across 2 networks.
Average DC fast power
360 kW (fastest stall: 360 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 6 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in Saint-Lambert

Featured charging locations in Saint-Lambert

  1. BRCC - Saint-Lambert - Stationnement Riverside — Saint-Lambert, QC, J4P 1B3 (Circuit électrique · DC Fast · 360 kW)
  2. Parc Lespérance — Saint-Lambert, QC, J4P 2R6 (Circuit électrique · Level 2 · 6.2 kW)
  3. Saint-Lambert - avenue Argyle - Hôtel de ville — Saint-Lambert, QC, J4P 2H3 (Circuit électrique · Level 2 · 6.2 kW)
  4. Desjardins - Charles-LeMoyne — Saint-Lambert, QC, J4P 2J1 (Circuit électrique · Level 2 · 6.2 kW)
  5. Saint-Lambert - rue Elm - Stationnement public — Saint-Lambert, QC, J4P 3S9 (Circuit électrique · Level 2 · 6.2 kW)
  6. BDR St-Lambert — Saint Lambert, QC, J4R 1A1 (FLO · Level 2 · 6 kW)

Nearby cities with EV charging coverage

Other cities in Quebec we cover with full charging data and site profitability scoring.

Incentives for EV chargers in Quebec

Saint-Lambert projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Quebec provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.

Use the analyzer to see which programs apply to a specific Saint-Lambert address along with eligible award amounts.

How profitability scores work in Saint-Lambert

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Saint-Lambert specifically, our model factors local commute corridors, the existing footprint of 1 DC fast and 5 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Saint-Lambert, Quebec?
There are 6 public EV charging locations in Saint-Lambert, Quebec, with a combined 13 individual chargers. 1 locations offer DC fast charging and 5 provide Level 2 charging.
What incentives apply to EV chargers in Quebec?
Most Saint-Lambert projects can stack the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) — covering up to 50% of project costs — with provincial Quebec programs and utility incentives. Class 56 accelerated CCA is also available for commercial charging hardware.
What is the largest EV charging network in Saint-Lambert?
Circuit électrique operates the most public charging locations in Saint-Lambert with 5 sites, followed by FLO with 1 sites.