Public EV charging in St-Jérôme, Quebec. 11 charging locations (5 DC fast, 6 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.
St-Jérôme, Quebec is served by 11 public electric vehicle charging locations operating roughly 20 individual chargers. Of those, 5 (45%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (55%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in St-Jérôme is Circuit électrique with 4 locations, followed by FLO with 3. Average DC fast power across the city is approximately 106 kW.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in Canada from 0 to 100 for DC Fast Charger ROI, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any St-Jérôme address below for an instant ROI score, demand projection, and recommended charger configuration — including ZEVIP, Quebec provincial, and utility incentive matching.
St-Jérôme stands out with a balanced mix of 11 public charging locations, including a robust 45% DC fast charging share. This balance allows for efficient charging options tailored for both quick turnovers and slower, longer-dwell needs. The average power output at DC fast sites is 106 kW, with a leading edge at 180 kW, indicating a readiness to accommodate a range of electric vehicles. Notably, 20% of these fast charging locations operate at 150 kW or higher, enhancing local infrastructure for future EV models. With four distinct networks, primarily driven by Circuit électrique, St-Jérôme provides a competitive yet accessible charging environment, setting the stage for optimal EV connectivity for residents and travelers alike.
Other cities in Quebec we cover with full charging data and site profitability scoring.
St-Jérôme projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Quebec provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.
Use the analyzer to see which programs apply to a specific St-Jérôme address along with eligible award amounts.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For St-Jérôme specifically, our model factors local commute corridors, the existing footprint of 5 DC fast and 6 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.