Install EV Chargers in Agoura Hills, California

Install EV chargers or analyze a site in Agoura Hills, California. 17 existing public charging locations (3 DC fast, 14 Level 2). Free 0–100 profitability score on any Agoura Hills address from EV Data Map by Charge Rigs.

Agoura Hills, California is served by 17 public electric vehicle charging locations operating 110 individual chargers — an average of 6.5 chargers per site. Of those locations, 3 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Agoura Hills is ChargePoint Network with 9 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 183 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Agoura Hills and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Agoura Hills

Agoura Hills boasts a diverse and competitive public EV charging landscape with 17 locations operated by 7 different networks, primarily dominated by ChargePoint Network. This variety not only fosters competitive pricing and uptime but also encourages drivers to choose based on power and amenities rather than brand loyalty. The city's DC fast chargers, averaging an impressive 183 kW and with 67% of sites rated at 150 kW-class or higher, signal a strong commitment to high-power options, critical for quick turnarounds. With an 18% DC fast share and approximately 37 fast charge ports available, Agoura Hills presents a compelling charging infrastructure that aligns well with evolving driver needs and preferences.

Agoura Hills charging by the numbers

Locations
17
Chargers
110
DC Fast locations
3
Level 2 locations
14

DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 6.5. Average DC fast power: 183 kW.

Agoura Hills charging — local snapshot

Top operator share
ChargePoint Network runs 53% of public locations across 7 networks.
Average DC fast power
183 kW (fastest stall: 350 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
18% DC fast / 82% Level 2 across 17 locations
Estimated DC ports
37 fast-charging ports city-wide

Charging networks in Agoura Hills

The following operators run public charging in Agoura Hills, ranked by number of locations.

Featured charging locations in Agoura Hills

A selection of higher-power public charging locations across Agoura Hills, sorted by power level.

  1. Regency Twin Oaks SC (Agoura Hills, CA) — Agoura Hills, CA, 91301 (Electrify America · DC Fast · 350 kW)
  2. Whizins Mall - Tesla Supercharger — Agoura Hills, CA, 91301 (Tesla · DC Fast · 150 kW)
  3. City of Calabasas - De Anza Park — Agoura Hills, CA, 91301 (eVgo Network · DC Fast · 50 kW)
  4. 17 Andalusia — Agoura Hills, CA, 91301 (Blink Network · Level 2 · 16.6 kW)
  5. 30301 Agoura Rd — Agoura Hills, CA, 91301 (LOOP · Level 2 · 7.7 kW)
  6. 26800 Agoura Rd — Agoura Hills, CA, 91301 (LOOP · Level 2 · 7.7 kW)
  7. Agoura High School — Agoura Hills, CA, 91301 (EV Connect · Level 2 · 7.2 kW)
  8. AGOURA BUILDING BUILDING A — Agoura Hills, CA, 91301 (ChargePoint Network · Level 2 · 6.5 kW)
  9. AGOURA HILLS #1 — Agoura Hills, CA, 91301 (ChargePoint Network · Level 2 · 6.5 kW)
  10. AGOURA HILLS #2 — Agoura Hills, CA, 91301 (ChargePoint Network · Level 2 · 6.5 kW)
  11. AGOURA HILLS #4 — Agoura Hills, CA, 91301 (ChargePoint Network · Level 2 · 6.5 kW)
  12. AGOURA BUILDING BUILDING C — Agoura Hills, CA, 91301 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Agoura Hills specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Agoura Hills, California?
There are 17 public electric vehicle charging locations in Agoura Hills, California, with a combined 110 individual chargers. 3 locations offer DC fast charging and 14 provide Level 2 charging.
What is the largest EV charging network in Agoura Hills?
ChargePoint Network operates the most public charging locations in Agoura Hills with 9 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Agoura Hills?
Level 2 EV chargers in Agoura Hills typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Agoura Hills?
Most Agoura Hills projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Agoura Hills?
A typical commercial Level 2 installation in Agoura Hills energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Agoura Hills take to become profitable?
Payback in Agoura Hills depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.