Install EV Chargers in Malibu, California

Install EV chargers or analyze a site in Malibu, California. 65 existing public charging locations (4 DC fast, 61 Level 2). Free 0–100 profitability score on any Malibu address from EV Data Map by Charge Rigs.

Malibu, California is served by 65 public electric vehicle charging locations operating 185 individual chargers — an average of 2.8 chargers per site. Of those locations, 4 (6%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 61 (94%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Malibu is ChargePoint Network with 53 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 231 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Malibu and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Malibu

In Malibu, California, the public EV charging landscape is heavily influenced by ChargePoint Network, which oversees 82% of the city's 65 charging locations, ensuring a consistent service experience. The local fleet boasts an impressive average DC fast charging power of 231 kW, with 75% of these stations rated at 150 kW or higher, positioning them at the forefront of ultra-fast charging options. With only 6% of the city's total charging points designated as DC fast, drivers seeking rapid charging will find a concentrated yet powerful network to meet their needs. New competitors should consider this operational dynamic and the competitive edge that new 150–350 kW installations could provide in attracting EV drivers navigating local charging options.

Malibu charging by the numbers

Locations
65
Chargers
185
DC Fast locations
4
Level 2 locations
61

DC fast share: 6% of locations. Level 2 share: 94%. Average chargers per site: 2.8. Average DC fast power: 231 kW.

Malibu charging — local snapshot

Top operator share
ChargePoint Network runs 82% of public locations across 8 networks.
Average DC fast power
231 kW (fastest stall: 350 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
6% DC fast / 94% Level 2 across 65 locations
Estimated DC ports
28 fast-charging ports city-wide

Charging networks in Malibu

The following operators run public charging in Malibu, ranked by number of locations.

Featured charging locations in Malibu

A selection of higher-power public charging locations across Malibu, sorted by power level.

  1. Malibu Village (Malibu, CA) — Malibu, CA, 90265 (Electrify America · DC Fast · 350 kW)
  2. Civic Center Way - Tesla Supercharger — Malibu, CA, 90265 (Tesla · DC Fast · 250 kW)
  3. Malibu Village - Tesla Supercharger — Malibu, CA, 90265 (Tesla · DC Fast · 250 kW)
  4. Whole Foods and the Park Malibu - Tesla Supercharger — Malibu, CA, 90265 (Tesla · DC Fast · 72 kW)
  5. Malibu Racquet Club — Malibu, CA, 90265 (LOOP · Level 2 · 7.7 kW)
  6. Getty Villa North L2 — Malibu, CA, 90265 (POWERFLEX · Level 2 · 7.7 kW)
  7. Malibu Civic Center — Malibu, CA, 90265 (Non-Networked · Level 2 · 7.2 kW)
  8. Paradise Cove Beach Cafe - Tesla Destination — Malibu, CA, 90265 (Tesla Destination · Level 2 · 7.2 kW)
  9. Geoffrey's Malibu - Tesla Destination — Malibu, CA, 90265 (Tesla Destination · Level 2 · 7.2 kW)
  10. Malibu High School — Malibu, CA, 90265 (EV Connect · Level 2 · 7.2 kW)
  11. Whole Foods Market — Malibu, CA, 90266 (Non-Networked · Level 2 · 7.2 kW)
  12. Malibu Country Mart — Malibu, CA, 90265 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Malibu specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 61 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Malibu, California?
There are 65 public electric vehicle charging locations in Malibu, California, with a combined 185 individual chargers. 4 locations offer DC fast charging and 61 provide Level 2 charging.
What is the largest EV charging network in Malibu?
ChargePoint Network operates the most public charging locations in Malibu with 53 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Malibu?
Level 2 EV chargers in Malibu typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Malibu?
Most Malibu projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Malibu?
A typical commercial Level 2 installation in Malibu energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Malibu take to become profitable?
Payback in Malibu depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.