Install EV Chargers in Moorpark, California

Install EV chargers or analyze a site in Moorpark, California. 12 existing public charging locations (2 DC fast, 10 Level 2). Free 0–100 profitability score on any Moorpark address from EV Data Map by Charge Rigs.

Moorpark, California is served by 12 public electric vehicle charging locations operating 30 individual chargers — an average of 2.5 chargers per site. Of those locations, 2 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Moorpark is ChargePoint Network with 8 locations, followed by eVgo Network with 2. Average DC fast power across the city is approximately 350 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Moorpark and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Moorpark

Moorpark, California, offers a unique EV charging landscape characterized by a strong presence of ChargePoint Network, which operates 67% of the city's 12 public charging locations. This concentration of charging sites creates a pivotal reliance on a single operator, impacting both reliability and pricing strategies for potential competitors. With all DC fast charging stations operating at a minimum of 150 kW, and an impressive average output of 350 kW, the fast charging options appeal to drivers seeking rapid turnaround. Additionally, the 17% share of DC fast chargers in Moorpark aligns well with the predominant Level 2 offerings, meeting diverse charging needs within the city. For site developers, this mix highlights specific opportunities where demand can be better aligned with service capabilities.

Moorpark charging by the numbers

Locations
12
Chargers
30
DC Fast locations
2
Level 2 locations
10

DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 2.5. Average DC fast power: 350 kW.

Moorpark charging — local snapshot

Top operator share
ChargePoint Network runs 67% of public locations across 3 networks.
Average DC fast power
350 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 12 locations
Estimated DC ports
12 fast-charging ports city-wide

Charging networks in Moorpark

The following operators run public charging in Moorpark, ranked by number of locations.

Featured charging locations in Moorpark

A selection of higher-power public charging locations across Moorpark, sorted by power level.

  1. Mountain Meadow Plaza — Moorpark, CA, 93021 (eVgo Network · DC Fast · 350 kW)
  2. Clover - 530 Moorpark Ave — Moorpark, CA, 93021 (eVgo Network · DC Fast · 350 kW)
  3. Moorpark Metrolink Station (North Lot) — Moorpark, CA, 93021 (Blink Network · Level 2 · 8.6 kW)
  4. Moorpark Metrolink Station (South Lot) — Moorpark, CA, 93021 (Blink Network · Level 2 · 8.6 kW)
  5. CITY MOORPARK ARROYO VISTA 1 — Moorpark, CA, 93021 (ChargePoint Network · Level 2 · 6.5 kW)
  6. MOORPARK STATION 02 — Moorpark, CA, 93021 (ChargePoint Network · Level 2 · 6.5 kW)
  7. MOORPARK STATION 05 — Moorpark, CA, 93021 (ChargePoint Network · Level 2 · 6.5 kW)
  8. MOORPARK STATION 04 — Moorpark, CA, 93021 (ChargePoint Network · Level 2 · 6.5 kW)
  9. MOORPARK STATION 01 — Moorpark, CA, 93021 (ChargePoint Network · Level 2 · 6.5 kW)
  10. MOORPARK STATION 03 — Moorpark, CA, 93021 (ChargePoint Network · Level 2 · 6.5 kW)
  11. CITY MOORPARK ARROYO VISTA 2 — Moorpark, CA, 93021 (ChargePoint Network · Level 2 · 6.5 kW)
  12. MOORPARK STATION 06 — Moorpark, CA, 93021 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Moorpark specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Moorpark, California?
There are 12 public electric vehicle charging locations in Moorpark, California, with a combined 30 individual chargers. 2 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Moorpark?
ChargePoint Network operates the most public charging locations in Moorpark with 8 sites, followed by eVgo Network with 2 sites.
How much does it cost to install an EV charger in Moorpark?
Level 2 EV chargers in Moorpark typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Moorpark?
Most Moorpark projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Moorpark?
A typical commercial Level 2 installation in Moorpark energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Moorpark take to become profitable?
Payback in Moorpark depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage