Install EV Chargers in Chatsworth, California

Install EV chargers or analyze a site in Chatsworth, California. 12 existing public charging locations (1 DC fast, 11 Level 2). Free 0–100 profitability score on any Chatsworth address from EV Data Map by Charge Rigs.

Chatsworth, California is served by 12 public electric vehicle charging locations operating 25 individual chargers — an average of 2.1 chargers per site. Of those locations, 1 (8%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (92%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Chatsworth is Non-Networked with 5 locations, followed by FLO with 3. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Chatsworth and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Chatsworth

Chatsworth boasts a competitive public charging landscape with 12 locations managed by six distinct operators, ensuring diverse options for EV drivers. Notably, the single DC fast charging station delivers an impressive average power of 250 kW, categorizing it among the fastest in the nation, and all such facilities exceed 150 kW. This variability promotes cost-effective pricing and high uptime as drivers can choose stations based on power and amenities rather than brand loyalty. With 8% of the public charging supply dedicated to DC fast options and the remainder fulfilling longer-duration Level 2 needs, the city's infrastructure strategically balances quick charging demands and everyday EV usage, creating a compelling environment for site developers and operators.

Chatsworth charging by the numbers

Locations
12
Chargers
25
DC Fast locations
1
Level 2 locations
11

DC fast share: 8% of locations. Level 2 share: 92%. Average chargers per site: 2.1. Average DC fast power: 250 kW.

Chatsworth charging — local snapshot

Top operator share
Non-Networked runs 42% of public locations across 6 networks.
Average DC fast power
250 kW (fastest stall: 250 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
8% DC fast / 92% Level 2 across 12 locations
Estimated DC ports
8 fast-charging ports city-wide

Charging networks in Chatsworth

The following operators run public charging in Chatsworth, ranked by number of locations.

Featured charging locations in Chatsworth

A selection of higher-power public charging locations across Chatsworth, sorted by power level.

  1. De Soto Square - Tesla Supercharger — Chatsworth, CA, 91311 (Tesla · DC Fast · 250 kW)
  2. Le Dev — Chatsworth, CA, 91311 (Blink Network · Level 2 · 8.6 kW)
  3. LADWP - Dearborn — Chatsworth, CA, 91311 (Non-Networked · Level 2 · 7.2 kW)
  4. LADWP - Lurline — Chatsworth, CA, 91311 (Non-Networked · Level 2 · 7.2 kW)
  5. 20217 Prairie St — Chatsworth, CA, 91311 (FLO · Level 2 · 7.2 kW)
  6. LADWP - Sunburst — Chatsworth, CA, 91311 (Non-Networked · Level 2 · 7.2 kW)
  7. LADWP - Variel — Chatsworth, CA, 91311 (Non-Networked · Level 2 · 7.2 kW)
  8. 21021 Devonshire St — Chatsworth, CA, 91311 (FLO · Level 2 · 7.2 kW)
  9. 10108 Mason Avenue — Chatsworth, CA, 91311 (FLO · Level 2 · 7.2 kW)
  10. 20963 Knapp St — Chatsworth, CA, 91311 (AMPUP · Level 2 · 7.2 kW)
  11. Los Angeles Metro - Chatsworth Metrolink Station — Chatsworth, CA, 91311 (Non-Networked · Level 2 · 7.2 kW)
  12. HQ STATION 5 CHATSWORTH EV 1 — Chatsworth, CA, 91311 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Chatsworth specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Chatsworth, California?
There are 12 public electric vehicle charging locations in Chatsworth, California, with a combined 25 individual chargers. 1 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Chatsworth?
Non-Networked operates the most public charging locations in Chatsworth with 5 sites, followed by FLO with 3 sites.
How much does it cost to install an EV charger in Chatsworth?
Level 2 EV chargers in Chatsworth typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Chatsworth?
Most Chatsworth projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Chatsworth?
A typical commercial Level 2 installation in Chatsworth energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Chatsworth take to become profitable?
Payback in Chatsworth depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage