Install EV Chargers in Chino, California

Install EV chargers or analyze a site in Chino, California. 15 existing public charging locations (3 DC fast, 12 Level 2). Free 0–100 profitability score on any Chino address from EV Data Map by Charge Rigs.

Chino, California is served by 15 public electric vehicle charging locations operating 52 individual chargers — an average of 3.5 chargers per site. Of those locations, 3 (20%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 12 (80%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Chino is ChargePoint Network with 12 locations, followed by Tesla with 2. Average DC fast power across the city is approximately 208 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Chino and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Chino

Chino, California presents a unique opportunity for charging site developers due to its significant reliance on the ChargePoint Network, which operates 80% of the 15 public charging locations. With 20% of these sites offering fast charging—averaging 208 kW and reaching up to 325 kW—developers looking to compete should prioritize high-capacity hardware, as 67% of DC fast locations exceed 150 kW. This infrastructure supports a mix of charging solutions, catering to both expedited charging needs and longer dwell times with Level 2 options. As nearby cities also enhance their charging networks, understanding Chino’s charging landscape and existing power capabilities will be crucial for optimizing site selection and meeting local driver demands effectively.

Chino charging by the numbers

Locations
15
Chargers
52
DC Fast locations
3
Level 2 locations
12

DC fast share: 20% of locations. Level 2 share: 80%. Average chargers per site: 3.5. Average DC fast power: 208 kW.

Chino charging — local snapshot

Top operator share
ChargePoint Network runs 80% of public locations across 3 networks.
Average DC fast power
208 kW (fastest stall: 325 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
20% DC fast / 80% Level 2 across 15 locations
Estimated DC ports
38 fast-charging ports city-wide

Charging networks in Chino

The following operators run public charging in Chino, ranked by number of locations.

Featured charging locations in Chino

A selection of higher-power public charging locations across Chino, sorted by power level.

  1. Chino Shopping Center - Tesla Supercharger — Chino, CA, 91710 (Tesla · DC Fast · 325 kW)
  2. Town Center at the Preserve - Tesla Supercharger — Chino, CA, 91708 (Tesla · DC Fast · 250 kW)
  3. Motel 6 Chino — Chino, CA, 91710 (EVCS · DC Fast · 50 kW)
  4. IEUA RP-2 STATION 02 — Chino, CA, 91708 (ChargePoint Network · Level 2 · 13.4 kW)
  5. IEUA RP-2 STATION 01 — Chino, CA, 91708 (ChargePoint Network · Level 2 · 13.4 kW)
  6. IEUA 1 HQB PUBLIC 01 — Chino, CA, 91708 (ChargePoint Network · Level 2 · 9.6 kW)
  7. IEUA 1 HQB PUBLIC 02 — Chino, CA, 91708 (ChargePoint Network · Level 2 · 9.6 kW)
  8. IEUA 1 HQA PUBLIC 01 — Chino, CA, 91708 (ChargePoint Network · Level 2 · 7.7 kW)
  9. IEUA 1 HQA PUBLIC 04 — Chino, CA, 91708 (ChargePoint Network · Level 2 · 7.7 kW)
  10. IEUA 1 HQA PUBLIC 02 — Chino, CA, 91708 (ChargePoint Network · Level 2 · 7.7 kW)
  11. IEUA 1 HQA PUBLIC 03 — Chino, CA, 91708 (ChargePoint Network · Level 2 · 7.7 kW)
  12. CITY OF CHINO COCC #2 — Chino, CA, 91710 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Chino specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 12 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Chino, California?
There are 15 public electric vehicle charging locations in Chino, California, with a combined 52 individual chargers. 3 locations offer DC fast charging and 12 provide Level 2 charging.
What is the largest EV charging network in Chino?
ChargePoint Network operates the most public charging locations in Chino with 12 sites, followed by Tesla with 2 sites.
How much does it cost to install an EV charger in Chino?
Level 2 EV chargers in Chino typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Chino?
Most Chino projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Chino?
A typical commercial Level 2 installation in Chino energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Chino take to become profitable?
Payback in Chino depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.