Install EV Chargers in Chino Hills, California

Install EV chargers or analyze a site in Chino Hills, California. 21 existing public charging locations (4 DC fast, 17 Level 2). Free 0–100 profitability score on any Chino Hills address from EV Data Map by Charge Rigs.

Chino Hills, California is served by 21 public electric vehicle charging locations operating 91 individual chargers — an average of 4.3 chargers per site. Of those locations, 4 (19%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 17 (81%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Chino Hills is ChargePoint Network with 14 locations, followed by LOOP with 3. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Chino Hills and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Chino Hills

In Chino Hills, California, the public EV charging landscape is notably centralized, with ChargePoint Network operating 65% of the 20 public locations. This concentration leads to a reliance on one operator for key factors like uptime and pricing, which can impact competitive site planning. The city boasts an impressive average power of 250 kW across its four DC fast chargers, with the fastest site reaching 350 kW, making it a prime destination for drivers prioritizing rapid charging. With 75% of DC fast chargers rated at 150 kW or higher, any new charging infrastructure aiming to gain traction will need to align with or exceed these performance metrics, taking advantage of the substantial 38 DC fast ports available.

Chino Hills charging by the numbers

Locations
21
Chargers
91
DC Fast locations
4
Level 2 locations
17

DC fast share: 19% of locations. Level 2 share: 81%. Average chargers per site: 4.3. Average DC fast power: 250 kW.

Chino Hills charging — local snapshot

Top operator share
ChargePoint Network runs 67% of public locations across 6 networks.
Average DC fast power
250 kW (fastest stall: 350 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
19% DC fast / 81% Level 2 across 21 locations
Estimated DC ports
38 fast-charging ports city-wide

Charging networks in Chino Hills

The following operators run public charging in Chino Hills, ranked by number of locations.

Featured charging locations in Chino Hills

A selection of higher-power public charging locations across Chino Hills, sorted by power level.

  1. Dunhill - Shoppes at Chino Hills (Chino Hills, CA) — Chino Hills, CA, 91709 (eVgo Network · DC Fast · 350 kW)
  2. Costco Chino Hills (Chino Hills, CA) — Chino Hills, CA, 91709 (Electrify America · DC Fast · 350 kW)
  3. The Shoppes at Chino Hills - Tesla Supercharger — Chino Hills, CA, 91709 (Tesla · DC Fast · 250 kW)
  4. 99 Ranch Chino Hills — Chino Hills, CA, 91709 (EVCS · DC Fast · 50 kW)
  5. TPS CHINO HILLS UNIT 2L — Chino Hills, CA, 91709 (ChargePoint Network · Level 2 · 7.7 kW)
  6. TPS CHINO HILLS UNIT 1R — Chino Hills, CA, 91709 (ChargePoint Network · Level 2 · 7.7 kW)
  7. HIEX UNIT 1 — Chino Hills, CA, 91709 (ChargePoint Network · Level 2 · 7.7 kW)
  8. Ayres Hotel Chino Hills — Chino Hills, CA, 91709 (LOOP · Level 2 · 7.7 kW)
  9. Avalon Chino Hills — Chino Hills, CA, 91709 (LOOP · Level 2 · 7.7 kW)
  10. Missions at Chino Hills — Chino Hills, CA, 91709 (LOOP · Level 2 · 7.7 kW)
  11. HIEX UNIT 2 — Chino Hills, CA, 91709 (ChargePoint Network · Level 2 · 7.7 kW)
  12. CITY OWNED CITY — Chino Hills, CA, 91709 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Chino Hills specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 17 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Chino Hills, California?
There are 21 public electric vehicle charging locations in Chino Hills, California, with a combined 91 individual chargers. 4 locations offer DC fast charging and 17 provide Level 2 charging.
What is the largest EV charging network in Chino Hills?
ChargePoint Network operates the most public charging locations in Chino Hills with 14 sites, followed by LOOP with 3 sites.
How much does it cost to install an EV charger in Chino Hills?
Level 2 EV chargers in Chino Hills typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Chino Hills?
Most Chino Hills projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Chino Hills?
A typical commercial Level 2 installation in Chino Hills energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Chino Hills take to become profitable?
Payback in Chino Hills depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.