Install EV chargers or analyze a site in Costa Mesa, California. 109 existing public charging locations (14 DC fast, 95 Level 2). Free 0–100 profitability score on any Costa Mesa address from EV Data Map by Charge Rigs.
Costa Mesa, California is served by 109 public electric vehicle charging locations operating 376 individual chargers — an average of 3.4 chargers per site. Of those locations, 14 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 95 (87%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Costa Mesa is ChargePoint Network with 87 locations, followed by Non-Networked with 4. Average DC fast power across the city is approximately 211 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Costa Mesa and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Costa Mesa
Costa Mesa, California, stands out in the EV charging landscape due to its significant concentration of public charging stations, with ChargePoint Network operating a commanding 80% of the 109 locations. This reliance on a single operator influences not only uptime and pricing but also the reliability of the network, a crucial factor for potential site developers. Among the 14 DC fast charging locations, the average power output is a notable 211 kW, with 64% classified as 150 kW or higher, positioning Costa Mesa as a promising hub for ultra-fast charging. As the market grows, new installations that can match or exceed this power will be key to attracting drivers, making strategic site development essential in this competitive environment.
Costa Mesa charging by the numbers
Locations
109
Chargers
376
DC Fast locations
14
Level 2 locations
95
DC fast share: 13% of locations. Level 2 share: 87%. Average chargers per site: 3.4. Average DC fast power: 211 kW.
Costa Mesa charging — local snapshot
Top operator share
ChargePoint Network runs 80% of public locations across 11 networks.
Average DC fast power
211 kW (fastest stall: 350 kW)
High-power share
64% of DC fast sites are 150 kW-class or higher
Mix
13% DC fast / 87% Level 2 across 109 locations
Estimated DC ports
109 fast-charging ports city-wide
Charging networks in Costa Mesa
The following operators run public charging in Costa Mesa, ranked by number of locations.
ChargePoint Network — 87 locations
Non-Networked — 4 locations
Tesla — 4 locations
Tesla Destination — 4 locations
LOOP — 2 locations
Blink Network — 2 locations
eVgo Network — 2 locations
Electrify America — 1 location
Featured charging locations in Costa Mesa
A selection of higher-power public charging locations across Costa Mesa, sorted by power level.
IKEA 167 Los Angeles (Costa Mesa, CA) — Costa Mesa, CA, 92626 (Electrify America · DC Fast · 350 kW)
Rove EV Charging Hub - Costa Mesa — Costa Mesa, CA, 92627 (ROVE · DC Fast · 350 kW)
Metro Pointe — Costa Mesa, CA, 92626 (eVgo Network · DC Fast · 350 kW)
South Coast Collection (SoCo) — Costa Mesa, CA, 92626 (eVgo Network · DC Fast · 350 kW)
Rove EV Charging Hub - Tesla Supercharger — Costa Mesa, CA, 92627 (Tesla · DC Fast · 325 kW)
IKEA - Tesla Supercharger — Costa Mesa, CA, 92626 (Tesla · DC Fast · 250 kW)
SOCO & The OC Mix - Tesla Supercharger — Costa Mesa, CA, 92626 (Tesla · DC Fast · 250 kW)
Costa Mesa, CA - Bristol Street - Tesla Supercharger — Costa Mesa, CA, 92626 (Tesla · DC Fast · 250 kW)
L491 EXPP-SERVICE-1 — Costa Mesa, CA, 92626 (ChargePoint Network · DC Fast · 200 kW)
SOUTHCOASTPLAZA WEST DCFC 03 — Costa Mesa, CA, 92626 (ChargePoint Network · DC Fast · 62.5 kW)
SOUTHCOASTPLAZA WEST DCFC 02 — Costa Mesa, CA, 92626 (ChargePoint Network · DC Fast · 62.5 kW)
SOUTHCOASTPLAZA WEST DCFC 01 — Costa Mesa, CA, 92626 (ChargePoint Network · DC Fast · 62.5 kW)
Nearby cities with EV charging coverage
Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Costa Mesa specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 14 DC fast and 95 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Costa Mesa, California?
There are 109 public electric vehicle charging locations in Costa Mesa, California, with a combined 376 individual chargers. 14 locations offer DC fast charging and 95 provide Level 2 charging.
What is the largest EV charging network in Costa Mesa?
ChargePoint Network operates the most public charging locations in Costa Mesa with 87 sites, followed by Non-Networked with 4 sites.
How much does it cost to install an EV charger in Costa Mesa?
Level 2 EV chargers in Costa Mesa typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Costa Mesa?
Most Costa Mesa projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Costa Mesa?
A typical commercial Level 2 installation in Costa Mesa energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Costa Mesa take to become profitable?
Payback in Costa Mesa depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.