Install EV Chargers in Huntington Beach, California

Install EV chargers or analyze a site in Huntington Beach, California. 50 existing public charging locations (8 DC fast, 42 Level 2). Free 0–100 profitability score on any Huntington Beach address from EV Data Map by Charge Rigs.

Huntington Beach, California is served by 50 public electric vehicle charging locations operating 186 individual chargers — an average of 3.7 chargers per site. Of those locations, 8 (16%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 42 (84%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Huntington Beach is ChargePoint Network with 30 locations, followed by Blink Network with 5. Average DC fast power across the city is approximately 200 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Huntington Beach and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Huntington Beach

Huntington Beach stands out in the EV charging landscape thanks to its concentration of ChargePoint Network, which dominates 60% of the 50 public charging locations. This reliance on a single operator facilitates consistent uptime and pricing, making it a crucial factor for new site developers to consider. The city's eight DC fast charging stations boast an impressive average power of 200 kW, with half of these stations rated at 150 kW or greater, positioning them as some of the fastest in the region. With 44 DC fast ports available, and a mix of Level 2 chargers catering to longer-dwell usage, there’s significant opportunity for operators to strategically fill gaps in this robust charging ecosystem.

Huntington Beach charging by the numbers

Locations
50
Chargers
186
DC Fast locations
8
Level 2 locations
42

DC fast share: 16% of locations. Level 2 share: 84%. Average chargers per site: 3.7. Average DC fast power: 200 kW.

Huntington Beach charging — local snapshot

Top operator share
ChargePoint Network runs 60% of public locations across 12 networks.
Average DC fast power
200 kW (fastest stall: 350 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
16% DC fast / 84% Level 2 across 50 locations
Estimated DC ports
44 fast-charging ports city-wide

Charging networks in Huntington Beach

The following operators run public charging in Huntington Beach, ranked by number of locations.

Featured charging locations in Huntington Beach

A selection of higher-power public charging locations across Huntington Beach, sorted by power level.

  1. Target T2051 (Huntington Beach, CA) — Huntington Beach, CA, 92646 (Electrify America · DC Fast · 350 kW)
  2. Brookhurst & Adams — Huntington Beach, CA, 92646 (eVgo Network · DC Fast · 350 kW)
  3. Kimco Marina Village (Huntington Beach, CA) — Huntington Beach, CA, 92649 (Electrify America · DC Fast · 350 kW)
  4. Amazon Fresh - Tesla Supercharger — Huntington Beach, CA, 92647 (Tesla · DC Fast · 325 kW)
  5. Norm Reeves Honda Superstore Huntington Beach — Huntington Beach, CA, 92648 (LOOP · DC Fast · 75 kW)
  6. US Bank Seacliff Village — Huntington Beach, CA, 92648 (EVCS · DC Fast · 50 kW)
  7. G&M OIL CHEVRON #183 — Huntington Beach, CA, 92648 (ChargePoint Network · DC Fast · 50 kW)
  8. Huntington Beach Promenade — Huntington Beach, CA, 92648 (eVgo Network · DC Fast · 50 kW)
  9. FULL CHARGE CPF50 2 — Huntington Beach, CA, 92648 (ChargePoint Network · Level 2 · 12 kW)
  10. FULL CHARGE CPF50 3 — Huntington Beach, CA, 92648 (ChargePoint Network · Level 2 · 12 kW)
  11. Paxton Apartments - Communal — Huntington Beach, CA, 92648 (NOODOE · Level 2 · 9.6 kW)
  12. Precision Resource — Huntington Beach, CA, 92649 (OpConnect · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Huntington Beach specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 8 DC fast and 42 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Huntington Beach, California?
There are 50 public electric vehicle charging locations in Huntington Beach, California, with a combined 186 individual chargers. 8 locations offer DC fast charging and 42 provide Level 2 charging.
What is the largest EV charging network in Huntington Beach?
ChargePoint Network operates the most public charging locations in Huntington Beach with 30 sites, followed by Blink Network with 5 sites.
How much does it cost to install an EV charger in Huntington Beach?
Level 2 EV chargers in Huntington Beach typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Huntington Beach?
Most Huntington Beach projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Huntington Beach?
A typical commercial Level 2 installation in Huntington Beach energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Huntington Beach take to become profitable?
Payback in Huntington Beach depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage