Install EV Chargers in Montebello, California

Install EV chargers or analyze a site in Montebello, California. 32 existing public charging locations (3 DC fast, 29 Level 2). Free 0–100 profitability score on any Montebello address from EV Data Map by Charge Rigs.

Montebello, California is served by 32 public electric vehicle charging locations operating 150 individual chargers — an average of 4.7 chargers per site. Of those locations, 3 (9%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 29 (91%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Montebello is ChargePoint Network with 25 locations, followed by Non-Networked with 2. Average DC fast power across the city is approximately 183 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Montebello and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Montebello

In Montebello, California, the public EV charging landscape is heavily influenced by ChargePoint Network, which operates 78% of the city’s 32 charging locations. This concentration ensures a consistent user experience, but it also presents an opportunity for new developers to differentiate themselves by offering additional charging options. The three DC fast charging sites, averaging a robust 183 kW and with one stall reaching up to 350 kW, set a high standard for power delivery in the region. With 67% of these fast chargers rated at 150 kW or higher, versatile charging strategies targeting both fast and Level 2 options can attract diverse EV drivers, especially as nearby cities evolve their own charging infrastructures.

Montebello charging by the numbers

Locations
32
Chargers
150
DC Fast locations
3
Level 2 locations
29

DC fast share: 9% of locations. Level 2 share: 91%. Average chargers per site: 4.7. Average DC fast power: 183 kW.

Montebello charging — local snapshot

Top operator share
ChargePoint Network runs 78% of public locations across 7 networks.
Average DC fast power
183 kW (fastest stall: 350 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
9% DC fast / 91% Level 2 across 32 locations
Estimated DC ports
68 fast-charging ports city-wide

Charging networks in Montebello

The following operators run public charging in Montebello, ranked by number of locations.

Featured charging locations in Montebello

A selection of higher-power public charging locations across Montebello, sorted by power level.

  1. Montebello Plaza (Montebello , CA) — Montebello, CA, 90640 (Electrify America · DC Fast · 350 kW)
  2. Smart & Final - Tesla Supercharger — Montebello, CA, 90640 (Tesla · DC Fast · 150 kW)
  3. H&S ENERGY H&S#20 CHEVRON — Montebello, CA, 90640 (ChargePoint Network · DC Fast · 50 kW)
  4. Ford of Montebello — Montebello, CA, 90640 (CHARGESMART_EV · Level 2 · 19 kW)
  5. TOPGOLG MB EV STATION 4 — Montebello, CA, 90640 (ChargePoint Network · Level 2 · 13 kW)
  6. TOPGOLG MB EV STATION 19 — Montebello, CA, 90640 (ChargePoint Network · Level 2 · 11.5 kW)
  7. TOPGOLG MB EV STATION 18 — Montebello, CA, 90640 (ChargePoint Network · Level 2 · 11.5 kW)
  8. TOPGOLG MB EV STATION 1 — Montebello, CA, 90640 (ChargePoint Network · Level 2 · 11.5 kW)
  9. TOPGOLG MB EV STATION 14 — Montebello, CA, 90640 (ChargePoint Network · Level 2 · 11.5 kW)
  10. TOPGOLG MB EV STATION 11 — Montebello, CA, 90640 (ChargePoint Network · Level 2 · 11.5 kW)
  11. TOPGOLG MB EV STATION 10 — Montebello, CA, 90640 (ChargePoint Network · Level 2 · 11.5 kW)
  12. TOPGOLG MB EV STATION 2 — Montebello, CA, 90640 (ChargePoint Network · Level 2 · 11.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Montebello specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 29 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Montebello, California?
There are 32 public electric vehicle charging locations in Montebello, California, with a combined 150 individual chargers. 3 locations offer DC fast charging and 29 provide Level 2 charging.
What is the largest EV charging network in Montebello?
ChargePoint Network operates the most public charging locations in Montebello with 25 sites, followed by Non-Networked with 2 sites.
How much does it cost to install an EV charger in Montebello?
Level 2 EV chargers in Montebello typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Montebello?
Most Montebello projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Montebello?
A typical commercial Level 2 installation in Montebello energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Montebello take to become profitable?
Payback in Montebello depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage