Install EV Chargers in El Dorado Hills, California

Install EV chargers or analyze a site in El Dorado Hills, California. 11 existing public charging locations (2 DC fast, 9 Level 2). Free 0–100 profitability score on any El Dorado Hills address from EV Data Map by Charge Rigs.

El Dorado Hills, California is served by 11 public electric vehicle charging locations operating 31 individual chargers — an average of 2.8 chargers per site. Of those locations, 2 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in El Dorado Hills is ChargePoint Network with 6 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 175 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in El Dorado Hills and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in El Dorado Hills

El Dorado Hills, California, features a balanced mix of 11 public charging locations, offering a modern charging experience for EV drivers with a noteworthy 18% dedicated to DC fast charging. This local infrastructure is supported by four distinct networks, predominantly led by ChargePoint Network, which operates 55% of the charging sites. The two DC fast charging stations average 175 kW, with one reaching a peak power of 250 kW, indicating a commitment to high-performance options for quick turnarounds. Notably, half of the DC fast locations are 150 kW-class or higher, ensuring that El Dorado Hills meets the evolving power needs of electric vehicle users and competes effectively with neighboring cities.

El Dorado Hills charging by the numbers

Locations
11
Chargers
31
DC Fast locations
2
Level 2 locations
9

DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 2.8. Average DC fast power: 175 kW.

El Dorado Hills charging — local snapshot

Top operator share
ChargePoint Network runs 55% of public locations across 4 networks.
Average DC fast power
175 kW (fastest stall: 250 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
18% DC fast / 82% Level 2 across 11 locations
Estimated DC ports
14 fast-charging ports city-wide

Charging networks in El Dorado Hills

The following operators run public charging in El Dorado Hills, ranked by number of locations.

Featured charging locations in El Dorado Hills

A selection of higher-power public charging locations across El Dorado Hills, sorted by power level.

  1. Raley's O-N-E Market - Tesla Supercharger — El Dorado Hills, CA, 95762 (Tesla · DC Fast · 250 kW)
  2. Raley's — El Dorado Hills, CA, 95762 (eVgo Network · DC Fast · 100 kW)
  3. GED GED102 — El Dorado Hills, CA, 95762 (ChargePoint Network · Level 2 · 7.7 kW)
  4. GED GED103 — El Dorado Hills, CA, 95762 (ChargePoint Network · Level 2 · 7.7 kW)
  5. Mercedes-Benz of El Dorado Hills — El Dorado Hills, CA, 95762 (Non-Networked · Level 2 · 7.2 kW)
  6. El Dorado Hills Library — El Dorado Hills, CA, 95762 (Non-Networked · Level 2 · 7.2 kW)
  7. El Dorado Transit Park & Ride — El Dorado Hills, CA, 95762 (Non-Networked · Level 2 · 7.2 kW)
  8. WINDPLAY WINDPLAY # 1 — El Dorado Hills, CA, 95762 (ChargePoint Network · Level 2 · 6.5 kW)
  9. WINDPLAY WINDPLAY # 3 — El Dorado Hills, CA, 95762 (ChargePoint Network · Level 2 · 6.5 kW)
  10. OAK RIDGE HS ORHS 2 — El Dorado Hills, CA, 95762 (ChargePoint Network · Level 2 · 6.5 kW)
  11. OAK RIDGE HS ORHS 1 — El Dorado Hills, CA, 95762 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For El Dorado Hills specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in El Dorado Hills, California?
There are 11 public electric vehicle charging locations in El Dorado Hills, California, with a combined 31 individual chargers. 2 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in El Dorado Hills?
ChargePoint Network operates the most public charging locations in El Dorado Hills with 6 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in El Dorado Hills?
Level 2 EV chargers in El Dorado Hills typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in El Dorado Hills?
Most El Dorado Hills projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in El Dorado Hills?
A typical commercial Level 2 installation in El Dorado Hills energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in El Dorado Hills take to become profitable?
Payback in El Dorado Hills depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.