Install EV Chargers in Folsom, California

Install EV chargers or analyze a site in Folsom, California. 59 existing public charging locations (8 DC fast, 51 Level 2). Free 0–100 profitability score on any Folsom address from EV Data Map by Charge Rigs.

Folsom, California is served by 59 public electric vehicle charging locations operating 225 individual chargers — an average of 3.8 chargers per site. Of those locations, 8 (14%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 51 (86%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Folsom is ChargePoint Network with 37 locations, followed by Electrify America with 5. Average DC fast power across the city is approximately 216 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Folsom and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Folsom

Folsom, California, stands out in the EV charging landscape due to its significant reliance on the ChargePoint Network, which manages 63% of the city’s 59 public charging stations. This concentration can impact the reliability and pricing strategies of new site developers, as they are competing against a well-established operator. The city's DC fast charging locations, which constitute 14% of all public sites, feature an impressive average power output of 216 kW, with 63% classified at 150 kW or higher. This positions Folsom as a destination for ultra-fast charging options, making it essential for new operators to consider their hardware offerings in the 150-350 kW range to effectively attract EV drivers reliant on navigation apps for prompt charging solutions.

Folsom charging by the numbers

Locations
59
Chargers
225
DC Fast locations
8
Level 2 locations
51

DC fast share: 14% of locations. Level 2 share: 86%. Average chargers per site: 3.8. Average DC fast power: 216 kW.

Folsom charging — local snapshot

Top operator share
ChargePoint Network runs 63% of public locations across 11 networks.
Average DC fast power
216 kW (fastest stall: 350 kW)
High-power share
63% of DC fast sites are 150 kW-class or higher
Mix
14% DC fast / 86% Level 2 across 59 locations
Estimated DC ports
66 fast-charging ports city-wide

Charging networks in Folsom

The following operators run public charging in Folsom, ranked by number of locations.

Featured charging locations in Folsom

A selection of higher-power public charging locations across Folsom, sorted by power level.

  1. Folsom Premium Outlets (Folsom, CA) — Folsom, CA, 95630 (Electrify America · DC Fast · 350 kW)
  2. Ethan Conrad Folsom #61 — Folsom, CA, 95630 (eVgo Network · DC Fast · 350 kW)
  3. Prairie City Crossing - Tesla Supercharger — Folsom, CA, 95630 (Tesla · DC Fast · 325 kW)
  4. Palladio at Broadstone - Tesla Supercharger — Folsom, CA, 95630 (Tesla · DC Fast · 250 kW)
  5. Folsom Premium Outlets - Tesla Supercharger — Folsom, CA, 95630 (Tesla · DC Fast · 150 kW)
  6. GF4EVA CHEVRON F DC1 — Folsom, CA, 95630 (ChargePoint Network · DC Fast · 125 kW)
  7. GF4EVA CHEVRON F DC2 — Folsom, CA, 95630 (ChargePoint Network · DC Fast · 125 kW)
  8. Bel Air Grocery — Folsom, CA, 95630 (eVgo Network · DC Fast · 50 kW)
  9. Willow Springs Apartments — Folsom, CA, 95630 (Blink Network · Level 2 · 19.2 kW)
  10. Folsom Lake Chrysler Dodge Jeep Ram — Folsom, CA, 95630 (Blink Network · Level 2 · 13.5 kW)
  11. Folsom Ford — Folsom, CA, 95630 (NOODOE · Level 2 · 11.5 kW)
  12. HUBAPTS 3 — Folsom, CA, 95630 (ChargePoint Network · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Folsom specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 8 DC fast and 51 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Folsom, California?
There are 59 public electric vehicle charging locations in Folsom, California, with a combined 225 individual chargers. 8 locations offer DC fast charging and 51 provide Level 2 charging.
What is the largest EV charging network in Folsom?
ChargePoint Network operates the most public charging locations in Folsom with 37 sites, followed by Electrify America with 5 sites.
How much does it cost to install an EV charger in Folsom?
Level 2 EV chargers in Folsom typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Folsom?
Most Folsom projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Folsom?
A typical commercial Level 2 installation in Folsom energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Folsom take to become profitable?
Payback in Folsom depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage