Install EV Chargers in Yorba Linda, California

Install EV chargers or analyze a site in Yorba Linda, California. 19 existing public charging locations (5 DC fast, 14 Level 2). Free 0–100 profitability score on any Yorba Linda address from EV Data Map by Charge Rigs.

Yorba Linda, California is served by 19 public electric vehicle charging locations operating 62 individual chargers — an average of 3.3 chargers per site. Of those locations, 5 (26%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (74%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Yorba Linda is ChargePoint Network with 11 locations, followed by Tesla with 2. Average DC fast power across the city is approximately 190 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Yorba Linda and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Yorba Linda

Yorba Linda boasts a competitive public EV charging market with a diverse offering of 19 locations across eight distinct networks. This variety fosters appealing pricing and high uptime, leading drivers to choose based on power output and amenities rather than sticking to one brand. The city features five DC fast charging stations that average an impressive 190 kW, with the fastest option hitting 350 kW, making these installations some of the most robust in the area. Notably, 60% of these DC fast sites operate at 150 kW or higher, catering to the high-demand needs of EV drivers. With 26% of public locations dedicated to fast charging, Yorba Linda effectively supports both quick turnarounds and longer dwell times, creating a well-rounded charging landscape.

Yorba Linda charging by the numbers

Locations
19
Chargers
62
DC Fast locations
5
Level 2 locations
14

DC fast share: 26% of locations. Level 2 share: 74%. Average chargers per site: 3.3. Average DC fast power: 190 kW.

Yorba Linda charging — local snapshot

Top operator share
ChargePoint Network runs 58% of public locations across 8 networks.
Average DC fast power
190 kW (fastest stall: 350 kW)
High-power share
60% of DC fast sites are 150 kW-class or higher
Mix
26% DC fast / 74% Level 2 across 19 locations
Estimated DC ports
25 fast-charging ports city-wide

Charging networks in Yorba Linda

The following operators run public charging in Yorba Linda, ranked by number of locations.

Featured charging locations in Yorba Linda

A selection of higher-power public charging locations across Yorba Linda, sorted by power level.

  1. Yorba Canyon Center (Yorba Linda, CA) — Yorba Linda, CA, 92887 (Electrify America · DC Fast · 350 kW)
  2. Packing House Square - Tesla Supercharger — Yorba Linda, CA, 92886 (Tesla · DC Fast · 250 kW)
  3. Home Ranch - Tesla Supercharger — Yorba Linda, CA, 92886 (Tesla · DC Fast · 250 kW)
  4. Yorba Linda Town Center — Yorba Linda, CA, 92886 (eVgo Network · DC Fast · 50 kW)
  5. Faith Community Church Nazarene — Yorba Linda, CA, 92886 (EVCS · DC Fast · 50 kW)
  6. Friendship Baptist Church — Yorba Linda, CA, 92886 (Blink Network · Level 2 · 10.4 kW)
  7. Ayres Suites Yorba Linda — Yorba Linda, CA, 92887 (LOOP · Level 2 · 7.7 kW)
  8. Kohl’s - Yorba Linda — Yorba Linda, CA, 92887 (Non-Networked · Level 2 · 7.2 kW)
  9. YORBA LINDA PS LCAC 2 — Yorba Linda, CA, 92886 (ChargePoint Network · Level 2 · 6.5 kW)
  10. YORBA LINDA PS PARK STRUCT 1 — Yorba Linda, CA, 92886 (ChargePoint Network · Level 2 · 6.5 kW)
  11. YORBA LINDA PS LCAC 3 — Yorba Linda, CA, 92886 (ChargePoint Network · Level 2 · 6.5 kW)
  12. YORBA LINDA PS PARK STRUCT 2 — Yorba Linda, CA, 92886 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Yorba Linda specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Yorba Linda, California?
There are 19 public electric vehicle charging locations in Yorba Linda, California, with a combined 62 individual chargers. 5 locations offer DC fast charging and 14 provide Level 2 charging.
What is the largest EV charging network in Yorba Linda?
ChargePoint Network operates the most public charging locations in Yorba Linda with 11 sites, followed by Tesla with 2 sites.
How much does it cost to install an EV charger in Yorba Linda?
Level 2 EV chargers in Yorba Linda typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Yorba Linda?
Most Yorba Linda projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Yorba Linda?
A typical commercial Level 2 installation in Yorba Linda energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Yorba Linda take to become profitable?
Payback in Yorba Linda depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage