Install EV Chargers in Healdsburg, California

Install EV chargers or analyze a site in Healdsburg, California. 56 existing public charging locations (2 DC fast, 54 Level 2). Free 0–100 profitability score on any Healdsburg address from EV Data Map by Charge Rigs.

Healdsburg, California is served by 56 public electric vehicle charging locations operating 115 individual chargers — an average of 2.1 chargers per site. Of those locations, 2 (4%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 54 (96%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Healdsburg is ChargePoint Network with 29 locations, followed by Tesla Destination with 22. Average DC fast power across the city is approximately 275 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Healdsburg and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Healdsburg

Healdsburg boasts a competitive public EV charging landscape with 56 locations managed by five distinct networks, led by ChargePoint, which operates more than half of the sites. This diversity encourages drivers to choose based on power and amenities rather than being tied to a single brand. The two DC fast charging stations highlight Healdsburg's commitment to fast charging, averaging an impressive 275 kW, with the fastest stall reaching 350 kW. With 100% of DC fast sites falling in the 150 kW-class range or higher, Healdsburg is well-positioned to meet the demands of EV drivers seeking ultra-fast charging options. The remainder of the locations service longer-dwell Level 2 needs, balancing the fast and steady demands of the local EV community.

Healdsburg charging by the numbers

Locations
56
Chargers
115
DC Fast locations
2
Level 2 locations
54

DC fast share: 4% of locations. Level 2 share: 96%. Average chargers per site: 2.1. Average DC fast power: 275 kW.

Healdsburg charging — local snapshot

Top operator share
ChargePoint Network runs 52% of public locations across 5 networks.
Average DC fast power
275 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
4% DC fast / 96% Level 2 across 56 locations
Estimated DC ports
6 fast-charging ports city-wide

Charging networks in Healdsburg

The following operators run public charging in Healdsburg, ranked by number of locations.

Featured charging locations in Healdsburg

A selection of higher-power public charging locations across Healdsburg, sorted by power level.

  1. Albertsons-Safeway 0998 (Healdsburg, CA) — Healdsburg, CA, 95448 (Electrify America · DC Fast · 350 kW)
  2. Healdsburg — Healdsburg, CA, 95448 (SHELL_RECHARGE · DC Fast · 200 kW)
  3. PUBLIC MAHER 2 — Healdsburg, CA, 95448 (ChargePoint Network · Level 2 · 19.2 kW)
  4. PUBLIC SENIOR CNTR 1&2 — Healdsburg, CA, 95448 (ChargePoint Network · Level 2 · 19.2 kW)
  5. PUBLIC MAHER 3&4 — Healdsburg, CA, 95448 (ChargePoint Network · Level 2 · 19.2 kW)
  6. PUBLIC MAHER 5&6 — Healdsburg, CA, 95448 (ChargePoint Network · Level 2 · 19.2 kW)
  7. PUBLIC MAHER 1 — Healdsburg, CA, 95448 (ChargePoint Network · Level 2 · 19.2 kW)
  8. PUBLIC SENIOR CENTER 4 — Healdsburg, CA, 95448 (ChargePoint Network · Level 2 · 12 kW)
  9. Simi Station — Healdsburg, CA, 95448 (Non-Networked · Level 2 · 12 kW)
  10. WAFLEET WATER ED 1 — Healdsburg, CA, 95448 (ChargePoint Network · Level 2 · 12 kW)
  11. PUBLIC SENIOR CENTER 3 — Healdsburg, CA, 95448 (ChargePoint Network · Level 2 · 12 kW)
  12. APPELLATION HBG STATION 4 — Healdsburg, CA, 95448 (ChargePoint Network · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Healdsburg specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 54 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Healdsburg, California?
There are 56 public electric vehicle charging locations in Healdsburg, California, with a combined 115 individual chargers. 2 locations offer DC fast charging and 54 provide Level 2 charging.
What is the largest EV charging network in Healdsburg?
ChargePoint Network operates the most public charging locations in Healdsburg with 29 sites, followed by Tesla Destination with 22 sites.
How much does it cost to install an EV charger in Healdsburg?
Level 2 EV chargers in Healdsburg typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Healdsburg?
Most Healdsburg projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Healdsburg?
A typical commercial Level 2 installation in Healdsburg energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Healdsburg take to become profitable?
Payback in Healdsburg depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.