Install EV Chargers in Sebastopol, California

Install EV chargers or analyze a site in Sebastopol, California. 12 existing public charging locations (2 DC fast, 10 Level 2). Free 0–100 profitability score on any Sebastopol address from EV Data Map by Charge Rigs.

Sebastopol, California is served by 12 public electric vehicle charging locations operating 30 individual chargers — an average of 2.5 chargers per site. Of those locations, 2 (17%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (83%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Sebastopol is ChargePoint Network with 9 locations, followed by Tesla with 1. Average DC fast power across the city is approximately 188 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Sebastopol and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Sebastopol

Sebastopol, California, features a concentrated EV charging landscape dominated by ChargePoint Network, which operates 75% of the city's 12 public charging locations. This reliance on a single operator enhances the dependability of services but also poses challenges for new site developments looking to differentiate. With 17% of the charging stations offering DC fast charging, these two locations provide an impressive average power of 188 kW, with the fastest stall reaching 325 kW. Given that half of these fast chargers are rated 150 kW or higher, there’s an opportunity for newcomers to install competitive hardware in this high-demand market. The mix of charging options also highlights the necessity for robust Level 2 solutions to support longer dwell times, making Sebastopol's charging landscape both competitive and crucial for strategic planning.

Sebastopol charging by the numbers

Locations
12
Chargers
30
DC Fast locations
2
Level 2 locations
10

DC fast share: 17% of locations. Level 2 share: 83%. Average chargers per site: 2.5. Average DC fast power: 188 kW.

Sebastopol charging — local snapshot

Top operator share
ChargePoint Network runs 75% of public locations across 4 networks.
Average DC fast power
188 kW (fastest stall: 325 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
17% DC fast / 83% Level 2 across 12 locations
Estimated DC ports
14 fast-charging ports city-wide

Charging networks in Sebastopol

The following operators run public charging in Sebastopol, ranked by number of locations.

Featured charging locations in Sebastopol

A selection of higher-power public charging locations across Sebastopol, sorted by power level.

  1. Redwood Marketplace - Tesla Supercharger — Sebastopol, CA, 95472 (Tesla · DC Fast · 325 kW)
  2. Lucky — Sebastopol, CA, 95472 (eVgo Network · DC Fast · 50 kW)
  3. Emeritus Vineyards - Tesla Destination — Sebastopol, CA, 95472 (Tesla Destination · Level 2 · 7.2 kW)
  4. SEBASTOPOL STATION 1 — Sebastopol, CA, 95472 (ChargePoint Network · Level 2 · 6.5 kW)
  5. SEBASTOPOL SEBASTOPOL 3 — Sebastopol, CA, 95472 (ChargePoint Network · Level 2 · 6.5 kW)
  6. CAR CHARGER CVS EV1 STATION — Sebastopol, CA, 95472 (ChargePoint Network · Level 2 · 6.5 kW)
  7. SEBASTOPOL SEBASTOPOL 1 — Sebastopol, CA, 95472 (ChargePoint Network · Level 2 · 6.5 kW)
  8. SEBASTOPOL STATION 2 — Sebastopol, CA, 95472 (ChargePoint Network · Level 2 · 6.5 kW)
  9. FAIRFIELD SEBAS FIS 1 — Sebastopol, CA, 95472 (ChargePoint Network · Level 2 · 6.5 kW)
  10. FAIRFIELD SEBAS STATION 2 — Sebastopol, CA, 95472 (ChargePoint Network · Level 2 · 6.5 kW)
  11. SEBASTOPOL SEBASTOPOL 2 — Sebastopol, CA, 95472 (ChargePoint Network · Level 2 · 6.5 kW)
  12. FREEMAN WINERY FREEMAN WINERY — Sebastopol, CA, 95472 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Sebastopol specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Sebastopol, California?
There are 12 public electric vehicle charging locations in Sebastopol, California, with a combined 30 individual chargers. 2 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Sebastopol?
ChargePoint Network operates the most public charging locations in Sebastopol with 9 sites, followed by Tesla with 1 sites.
How much does it cost to install an EV charger in Sebastopol?
Level 2 EV chargers in Sebastopol typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Sebastopol?
Most Sebastopol projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Sebastopol?
A typical commercial Level 2 installation in Sebastopol energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Sebastopol take to become profitable?
Payback in Sebastopol depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.