Install EV Chargers in Los Altos, California

Install EV chargers or analyze a site in Los Altos, California. 14 existing public charging locations (7 DC fast, 7 Level 2). Free 0–100 profitability score on any Los Altos address from EV Data Map by Charge Rigs.

Los Altos, California is served by 14 public electric vehicle charging locations operating 166 individual chargers — an average of 11.9 chargers per site. Of those locations, 7 (50%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (50%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Los Altos is Non-Networked with 4 locations, followed by ChargePoint Network with 3. Average DC fast power across the city is approximately 82 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Los Altos and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Los Altos

Los Altos offers a dynamic landscape for EV charging with its 14 public locations, split evenly between DC fast and Level 2 chargers, signaling a strong commitment to support diverse charging needs. The presence of seven distinct operators, led by Non-Networked, fosters competitive pricing and uptime, while the average DC fast power of 82 kW—alongside a peak option of 250 kW—provides efficient charging solutions. Notably, 14% of the DC fast sites exceed 150 kW, positioning Los Altos to attract driven drivers looking for robust charging options. As new, higher-capacity chargers emerge, they will further enhance the city's appeal, particularly when integrated into navigation apps that prioritize power and accessibility.

Los Altos charging by the numbers

Locations
14
Chargers
166
DC Fast locations
7
Level 2 locations
7

DC fast share: 50% of locations. Level 2 share: 50%. Average chargers per site: 11.9. Average DC fast power: 82 kW.

Los Altos charging — local snapshot

Top operator share
Non-Networked runs 29% of public locations across 7 networks.
Average DC fast power
82 kW (fastest stall: 250 kW)
High-power share
14% of DC fast sites are 150 kW-class or higher
Mix
50% DC fast / 50% Level 2 across 14 locations
Estimated DC ports
44 fast-charging ports city-wide

Charging networks in Los Altos

The following operators run public charging in Los Altos, ranked by number of locations.

Featured charging locations in Los Altos

A selection of higher-power public charging locations across Los Altos, sorted by power level.

  1. Municipal Parking Lot - Tesla Supercharger — Los Altos, CA, 94022 (Tesla · DC Fast · 250 kW)
  2. Whole Foods Los Altos - Tesla Supercharger — Los Altos, CA, 94022 (Tesla · DC Fast · 72 kW)
  3. LOS ALTOS DC250 1 — Los Altos, CA, 94022 (ChargePoint Network · DC Fast · 50 kW)
  4. Los Altos High School — Los Altos, CA, 94022 (Non-Networked · DC Fast · 50 kW)
  5. Whole Foods Market — Los Altos, CA, 94022 (eVgo Network · DC Fast · 50 kW)
  6. Covington Elementary School — Los Altos, CA, 94024 (POWERFLEX · DC Fast · 50 kW)
  7. Lucky — Los Altos, CA, 94024 (eVgo Network · DC Fast · 50 kW)
  8. CUPERTINO UNION MONTCLAIRE 2 — Los Altos, CA, 94024 (ChargePoint Network · Level 2 · 13.4 kW)
  9. CUPERTINO UNION MONTCLAIRE 1 — Los Altos, CA, 94024 (ChargePoint Network · Level 2 · 13.4 kW)
  10. Courtyard Marriott Palo Alto-Los Altos - Tesla Destination — Los Altos, CA, 94022 (Tesla Destination · Level 2 · 7.2 kW)
  11. Egan Junior High School — Los Altos, CA, 94022 (Non-Networked · Level 2 · 7.2 kW)
  12. Los Altos High School — Los Altos, CA, 94022 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Los Altos specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Los Altos, California?
There are 14 public electric vehicle charging locations in Los Altos, California, with a combined 166 individual chargers. 7 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in Los Altos?
Non-Networked operates the most public charging locations in Los Altos with 4 sites, followed by ChargePoint Network with 3 sites.
How much does it cost to install an EV charger in Los Altos?
Level 2 EV chargers in Los Altos typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Los Altos?
Most Los Altos projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Los Altos?
A typical commercial Level 2 installation in Los Altos energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Los Altos take to become profitable?
Payback in Los Altos depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage