Install EV chargers or analyze a site in Mountain View, California. 149 existing public charging locations (9 DC fast, 139 Level 2). Free 0–100 profitability score on any Mountain View address from EV Data Map by Charge Rigs.
Mountain View, California is served by 149 public electric vehicle charging locations operating 440 individual chargers — an average of 3.0 chargers per site. Of those locations, 9 (6%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 139 (93%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Mountain View is ChargePoint Network with 122 locations, followed by EV Connect with 8. Average DC fast power across the city is approximately 208 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Mountain View and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Mountain View
In Mountain View, California, the charging landscape is significantly influenced by ChargePoint Network, which commands 82% of the city's 149 public charging locations, ensuring reliable service but also establishing a competitive benchmark for pricing and uptime. The presence of 9 DC fast charging locations, with an impressive average power of 208 kW and the fastest stall reaching 350 kW, positions the city favorably in terms of ultra-fast charging capabilities. Notably, 67% of these DC fast sites exceed the 150 kW mark, creating an attractive proposition for EV drivers seeking quick top-ups. With 94% of the public charging infrastructure consisting of Level 2 stations, there’s a balanced opportunity for site developers to cater to both rapid and extended dwell-time charging needs.
Mountain View charging by the numbers
Locations
149
Chargers
440
DC Fast locations
9
Level 2 locations
139
DC fast share: 6% of locations. Level 2 share: 93%. Average chargers per site: 3.0. Average DC fast power: 208 kW.
Mountain View charging — local snapshot
Top operator share
ChargePoint Network runs 82% of public locations across 11 networks.
Average DC fast power
208 kW (fastest stall: 350 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
6% DC fast / 94% Level 2 across 149 locations
Estimated DC ports
78 fast-charging ports city-wide
Charging networks in Mountain View
The following operators run public charging in Mountain View, ranked by number of locations.
ChargePoint Network — 122 locations
EV Connect — 8 locations
Tesla — 3 locations
eVgo Network — 3 locations
POWERFLEX — 3 locations
Tesla Destination — 2 locations
Blink Network — 2 locations
EVMATCH — 2 locations
Featured charging locations in Mountain View
A selection of higher-power public charging locations across Mountain View, sorted by power level.
East Middlefield Road — Mountain View, CA, 94043 (eVgo Network · DC Fast · 350 kW)
Monta Loma Plaza — Mountain View, CA, 94043 (eVgo Network · DC Fast · 350 kW)
Walmart 2280 (Mountain View, CA) — Mountain View, CA, 94040 (Electrify America · DC Fast · 350 kW)
99 Market Ranch - Tesla Supercharger — Mountain View, CA, 94024 (Tesla · DC Fast · 250 kW)
El Monte Center - Tesla Supercharger — Mountain View, CA, 94040 (Tesla · DC Fast · 250 kW)
Computer History Museum - Tesla Supercharger — Mountain View, CA, 94043 (Tesla · DC Fast · 150 kW)
GOOGLE ALTA-L1-DCQ-02 — Mountain View, CA, 94043 (ChargePoint Network · DC Fast · 62.5 kW)
GOOGLE ALTA-L1-DCQ-01 — Mountain View, CA, 94043 (ChargePoint Network · DC Fast · 62.5 kW)
Nob Hill Foods — Mountain View, CA, 94040 (eVgo Network · DC Fast · 50 kW)
INTUIT MTV 21-44 FLOOR 4 — Mountain View, CA, 94043 (ChargePoint Network · Level 2 · 7.7 kW)
Palo Alto Plaza — Mountain View, CA, 94040 (EVMATCH · Level 2 · 7.7 kW)
Park Plaza Apartments — Mountain View, CA, 94040 (EVMATCH · Level 2 · 7.7 kW)
Nearby cities with EV charging coverage
Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Mountain View specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 9 DC fast and 139 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Mountain View, California?
There are 149 public electric vehicle charging locations in Mountain View, California, with a combined 440 individual chargers. 9 locations offer DC fast charging and 139 provide Level 2 charging.
What is the largest EV charging network in Mountain View?
ChargePoint Network operates the most public charging locations in Mountain View with 122 sites, followed by EV Connect with 8 sites.
How much does it cost to install an EV charger in Mountain View?
Level 2 EV chargers in Mountain View typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Mountain View?
Most Mountain View projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Mountain View?
A typical commercial Level 2 installation in Mountain View energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Mountain View take to become profitable?
Payback in Mountain View depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.