Install EV chargers or analyze a site in Camarillo, California. 45 existing public charging locations (4 DC fast, 41 Level 2). Free 0–100 profitability score on any Camarillo address from EV Data Map by Charge Rigs.
Camarillo, California is served by 45 public electric vehicle charging locations operating 184 individual chargers — an average of 4.1 chargers per site. Of those locations, 4 (9%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 41 (91%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Camarillo is ChargePoint Network with 34 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 263 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Camarillo and receive an instant ROI score, demand projection, and recommended charger configuration.
Camarillo boasts a concentrated charging infrastructure, with the ChargePoint Network managing 76% of its 45 public charging locations, ensuring high uptime and consistent pricing across the city. The 4 DC fast charging sites deliver an impressive average power of 263 kW, with 75% of these stations classified as 150 kW or higher, offering ultra-fast options that appeal to EV drivers. This distinction in charging speed positions Camarillo as an attractive destination for both local drivers and visitors, particularly as demand for rapid charging continues to rise. Furthermore, the available data highlights the significance of understanding site selection; with the majority of public locations focusing on Level 2 charging, there remains an opportunity to strategically introduce more high-power DC fast chargers to meet evolving consumer needs.
DC fast share: 9% of locations. Level 2 share: 91%. Average chargers per site: 4.1. Average DC fast power: 263 kW.
The following operators run public charging in Camarillo, ranked by number of locations.
A selection of higher-power public charging locations across Camarillo, sorted by power level.
Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Camarillo specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 41 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.