Install EV Chargers in Novato, California

Install EV chargers or analyze a site in Novato, California. 42 existing public charging locations (14 DC fast, 28 Level 2). Free 0–100 profitability score on any Novato address from EV Data Map by Charge Rigs.

Novato, California is served by 42 public electric vehicle charging locations operating 106 individual chargers — an average of 2.5 chargers per site. Of those locations, 14 (33%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 28 (67%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Novato is ChargePoint Network with 30 locations, followed by Non-Networked with 5. Average DC fast power across the city is approximately 167 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Novato and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Novato

Novato, California, features a robust EV charging landscape with a significant presence of ChargePoint Network, operating 71% of the city's 42 public charging locations. This concentration presents both opportunities and challenges for new site developers, as the heavy reliance on a single network can influence performance and pricing. With 33% of these locations offering DC fast charging, the city's average power delivery of 167 kW and a peak of 400 kW position it favorably within modern standards. Notably, 57% of DC fast sites are 150 kW or higher, making them competitive options for drivers seeking quicker turnaround times. Understanding this dynamic helps identify strategic gaps for new installations, especially as local demand continues to evolve.

Novato charging by the numbers

Locations
42
Chargers
106
DC Fast locations
14
Level 2 locations
28

DC fast share: 33% of locations. Level 2 share: 67%. Average chargers per site: 2.5. Average DC fast power: 167 kW.

Novato charging — local snapshot

Top operator share
ChargePoint Network runs 71% of public locations across 8 networks.
Average DC fast power
167 kW (fastest stall: 400 kW)
High-power share
57% of DC fast sites are 150 kW-class or higher
Mix
33% DC fast / 67% Level 2 across 42 locations
Estimated DC ports
52 fast-charging ports city-wide

Charging networks in Novato

The following operators run public charging in Novato, ranked by number of locations.

Featured charging locations in Novato

A selection of higher-power public charging locations across Novato, sorted by power level.

  1. Vintage Oaks - EVroadway — Novato, CA, 94945 (AUTEL · DC Fast · 400 kW)
  2. Novato Fair Shopping Center (Novato, CA) — Novato, CA, 94947 (Electrify America · DC Fast · 350 kW)
  3. Safeway - Tesla Supercharger — Novato, CA, 94947 (Tesla · DC Fast · 325 kW)
  4. EVROADWAY VO#6 — Novato, CA, 94945 (ChargePoint Network · DC Fast · 160 kW)
  5. EVROADWAY VO #7 — Novato, CA, 94945 (ChargePoint Network · DC Fast · 160 kW)
  6. EVROADWAY VO #9 — Novato, CA, 94945 (ChargePoint Network · DC Fast · 160 kW)
  7. EVROADWAY VO #4 — Novato, CA, 94945 (ChargePoint Network · DC Fast · 160 kW)
  8. Vintage Oaks Shopping Center - Tesla Supercharger — Novato, CA, 94945 (Tesla · DC Fast · 150 kW)
  9. EVROADWAY VO#5 — Novato, CA, 94945 (ChargePoint Network · DC Fast · 120 kW)
  10. EVROADWAY VO #8 — Novato, CA, 94945 (ChargePoint Network · DC Fast · 120 kW)
  11. EVROADWAY CA-CHIPOTLE01 — Novato, CA, 94945 (ChargePoint Network · DC Fast · 62.5 kW)
  12. EVROADWAY VO #2 — Novato, CA, 94945 (ChargePoint Network · DC Fast · 62.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Novato specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 14 DC fast and 28 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Novato, California?
There are 42 public electric vehicle charging locations in Novato, California, with a combined 106 individual chargers. 14 locations offer DC fast charging and 28 provide Level 2 charging.
What is the largest EV charging network in Novato?
ChargePoint Network operates the most public charging locations in Novato with 30 sites, followed by Non-Networked with 5 sites.
How much does it cost to install an EV charger in Novato?
Level 2 EV chargers in Novato typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Novato?
Most Novato projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Novato?
A typical commercial Level 2 installation in Novato energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Novato take to become profitable?
Payback in Novato depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage