Install EV Chargers in Petaluma, California

Install EV chargers or analyze a site in Petaluma, California. 37 existing public charging locations (7 DC fast, 30 Level 2). Free 0–100 profitability score on any Petaluma address from EV Data Map by Charge Rigs.

Petaluma, California is served by 37 public electric vehicle charging locations operating 165 individual chargers — an average of 4.5 chargers per site. Of those locations, 7 (19%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 30 (81%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Petaluma is ChargePoint Network with 19 locations, followed by POWERFLEX with 6. Average DC fast power across the city is approximately 156 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Petaluma and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Petaluma

Petaluma stands out in the EV charging landscape with a robust mix of 37 public charging locations, including a significant 19% dedicated to DC fast charging. With an average power output of 156 kW and the fastest stall reaching 350 kW, the city offers one of the more advanced charging infrastructures in the region. Notably, 43% of these fast chargers are classified at 150 kW or higher, catering to drivers' needs for quick and efficient charging. The presence of 9 distinct operators, led by ChargePoint Network, ensures competitive pricing and availability, allowing Petaluma drivers to choose based on power and amenities rather than brand loyalty. This diversity, combined with surrounding traffic and urban dynamics, positions Petaluma as a strategic hub for EV charging.

Petaluma charging by the numbers

Locations
37
Chargers
165
DC Fast locations
7
Level 2 locations
30

DC fast share: 19% of locations. Level 2 share: 81%. Average chargers per site: 4.5. Average DC fast power: 156 kW.

Petaluma charging — local snapshot

Top operator share
ChargePoint Network runs 51% of public locations across 9 networks.
Average DC fast power
156 kW (fastest stall: 350 kW)
High-power share
43% of DC fast sites are 150 kW-class or higher
Mix
19% DC fast / 81% Level 2 across 37 locations
Estimated DC ports
38 fast-charging ports city-wide

Charging networks in Petaluma

The following operators run public charging in Petaluma, ranked by number of locations.

Featured charging locations in Petaluma

A selection of higher-power public charging locations across Petaluma, sorted by power level.

  1. Simon Petaluma Village Premium Outlets (Petaluma, Ca) — Petaluma, CA, 94952 (Electrify America · DC Fast · 350 kW)
  2. Plaza South Shopping Center — Petaluma, CA, 94954 (eVgo Network · DC Fast · 350 kW)
  3. East Washington Place Shopping Center - Tesla Supercharger — Petaluma, CA, 94952 (Tesla · DC Fast · 150 kW)
  4. City of Petaluma — Petaluma, CA, 94952 (Blink Network · DC Fast · 120 kW)
  5. North Bay Nissan — Petaluma, CA, 94952 (Non-Networked · DC Fast · 50 kW)
  6. Petaluma Village Premium Outlets — Petaluma, CA, 94952 (eVgo Network · DC Fast · 50 kW)
  7. Two Rock Station — Petaluma, CA, 94952 (Non-Networked · DC Fast · 25 kW)
  8. 330 Western Ave — Petaluma, CA, 94952 (Blink Network · Level 2 · 19.2 kW)
  9. Quality Inn Petaluma Station — Petaluma, CA, 94954 (EV Connect · Level 2 · 9.6 kW)
  10. CITYOFPETALUMA KELLER GARAGE — Petaluma, CA, 94952 (ChargePoint Network · Level 2 · 7.7 kW)
  11. PF CA PT 1800BSP — Petaluma, CA, 94954 (POWERFLEX · Level 2 · 7.2 kW)
  12. PF CA PT BSP2000 — Petaluma, CA, 94954 (POWERFLEX · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Petaluma specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 30 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Petaluma, California?
There are 37 public electric vehicle charging locations in Petaluma, California, with a combined 165 individual chargers. 7 locations offer DC fast charging and 30 provide Level 2 charging.
What is the largest EV charging network in Petaluma?
ChargePoint Network operates the most public charging locations in Petaluma with 19 sites, followed by POWERFLEX with 6 sites.
How much does it cost to install an EV charger in Petaluma?
Level 2 EV chargers in Petaluma typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Petaluma?
Most Petaluma projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Petaluma?
A typical commercial Level 2 installation in Petaluma energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Petaluma take to become profitable?
Payback in Petaluma depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage