Install EV Chargers in Mill Valley, California

Install EV chargers or analyze a site in Mill Valley, California. 11 existing public charging locations (3 DC fast, 8 Level 2). Free 0–100 profitability score on any Mill Valley address from EV Data Map by Charge Rigs.

Mill Valley, California is served by 11 public electric vehicle charging locations operating 33 individual chargers — an average of 3.0 chargers per site. Of those locations, 3 (27%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 8 (73%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Mill Valley is ChargePoint Network with 6 locations, followed by Electrify America with 1. Average DC fast power across the city is approximately 242 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Mill Valley and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Mill Valley

Mill Valley stands out with a competitive public charging landscape featuring 11 locations, including 3 DC fast charging sites that boast an impressive average power of 242 kW, reaching up to 350 kW at the fastest stall. This robust infrastructure includes a diverse mix of 6 distinct charging networks, predominantly led by ChargePoint Network, which operates 55% of the sites. Such variety not only enhances pricing competition but also allows EV drivers to select charging options based on power capabilities and amenities, rather than being tethered to a single brand. With 67% of DC fast stations rated at 150 kW or higher, Mill Valley positions itself as a strategic hub for efficient charging, catering to both high-power needs and longer-dwell Level 2 demand.

Mill Valley charging by the numbers

Locations
11
Chargers
33
DC Fast locations
3
Level 2 locations
8

DC fast share: 27% of locations. Level 2 share: 73%. Average chargers per site: 3.0. Average DC fast power: 242 kW.

Mill Valley charging — local snapshot

Top operator share
ChargePoint Network runs 55% of public locations across 6 networks.
Average DC fast power
242 kW (fastest stall: 350 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
27% DC fast / 73% Level 2 across 11 locations
Estimated DC ports
18 fast-charging ports city-wide

Charging networks in Mill Valley

The following operators run public charging in Mill Valley, ranked by number of locations.

Featured charging locations in Mill Valley

A selection of higher-power public charging locations across Mill Valley, sorted by power level.

  1. Safeway 0788 (Mill Valley, CA) — Mill Valley, CA, 94941 (Electrify America · DC Fast · 350 kW)
  2. Strawberry Village - Tesla Supercharger — Mill Valley, CA, 94941 (Tesla · DC Fast · 325 kW)
  3. Whole Foods Mill Valley - E Blithedale — Mill Valley, CA, 94941 (eVgo Network · DC Fast · 50 kW)
  4. TUHSD THSEV8 — Mill Valley, CA, 94941 (ChargePoint Network · Level 2 · 13.4 kW)
  5. TUHSD THSEV1+2 — Mill Valley, CA, 94941 (ChargePoint Network · Level 2 · 13.4 kW)
  6. TUHSD THSEV5+6 — Mill Valley, CA, 94941 (ChargePoint Network · Level 2 · 13.4 kW)
  7. TUHSD THSEV3+4 — Mill Valley, CA, 94941 (ChargePoint Network · Level 2 · 13.4 kW)
  8. TUHSD THSEV7 — Mill Valley, CA, 94941 (ChargePoint Network · Level 2 · 13.4 kW)
  9. Golden Gate National Recreation Area – Muir Woods — Mill Valley, CA, 94941 (RIVIAN_WAYPOINTS · Level 2 · 11 kW)
  10. PWRO: GOGA Public Electric Vehicle Chargers - 2.C — Mill Valley, CA, 94941 (Non-Networked · Level 2 · 7.2 kW)
  11. HAUKE PARK HAUKE PARK 1 — Mill Valley, CA, 94941 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Mill Valley specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 3 DC fast and 8 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Mill Valley, California?
There are 11 public electric vehicle charging locations in Mill Valley, California, with a combined 33 individual chargers. 3 locations offer DC fast charging and 8 provide Level 2 charging.
What is the largest EV charging network in Mill Valley?
ChargePoint Network operates the most public charging locations in Mill Valley with 6 sites, followed by Electrify America with 1 sites.
How much does it cost to install an EV charger in Mill Valley?
Level 2 EV chargers in Mill Valley typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Mill Valley?
Most Mill Valley projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Mill Valley?
A typical commercial Level 2 installation in Mill Valley energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Mill Valley take to become profitable?
Payback in Mill Valley depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage