Install EV Chargers in Vacaville, California

Install EV chargers or analyze a site in Vacaville, California. 46 existing public charging locations (11 DC fast, 35 Level 2). Free 0–100 profitability score on any Vacaville address from EV Data Map by Charge Rigs.

Vacaville, California is served by 46 public electric vehicle charging locations operating 171 individual chargers — an average of 3.7 chargers per site. Of those locations, 11 (24%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 35 (76%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Vacaville is ChargePoint Network with 25 locations, followed by Non-Networked with 10. Average DC fast power across the city is approximately 223 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Vacaville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Vacaville

Vacaville boasts a competitive EV charging landscape with 46 public charging locations facilitated by five distinct operators, ensuring a diverse selection for users. ChargePoint Network stands out, commanding 54% of the sites, which promotes competitive pricing and reliable uptime. The city is particularly well-equipped for fast charging, with 24% of its stations offering DC fast charging options that average 223 kW, including a remarkable 350 kW stall. Notably, 73% of these fast charging sites are in the 150 kW-class or higher, attracting EV drivers who prioritize speed and performance while navigating local infrastructure. This blend of amenities and power levels enhances the charging experience and aids in strategic site selection for developers looking to capitalize on growing EV demand in the region.

Vacaville charging by the numbers

Locations
46
Chargers
171
DC Fast locations
11
Level 2 locations
35

DC fast share: 24% of locations. Level 2 share: 76%. Average chargers per site: 3.7. Average DC fast power: 223 kW.

Vacaville charging — local snapshot

Top operator share
ChargePoint Network runs 54% of public locations across 5 networks.
Average DC fast power
223 kW (fastest stall: 350 kW)
High-power share
73% of DC fast sites are 150 kW-class or higher
Mix
24% DC fast / 76% Level 2 across 46 locations
Estimated DC ports
100 fast-charging ports city-wide

Charging networks in Vacaville

The following operators run public charging in Vacaville, ranked by number of locations.

Featured charging locations in Vacaville

A selection of higher-power public charging locations across Vacaville, sorted by power level.

  1. WinCo Foods - Vacaville #60 — Vacaville, CA, 95687 (eVgo Network · DC Fast · 350 kW)
  2. Vacaville Premium Outlets (Vacaville, CA) — Vacaville, CA, 95687 (Electrify America · DC Fast · 350 kW)
  3. Nut Tree Plaza — Vacaville, CA, 95688 (eVgo Network · DC Fast · 350 kW)
  4. Nut Tree Plaza - Tesla Supercharger — Vacaville, CA, 95688 (Tesla · DC Fast · 325 kW)
  5. Alamo Plaza - Tesla Supercharger — Vacaville, CA, 95688 (Tesla · DC Fast · 250 kW)
  6. Browns Valley Marketplace - Tesla Supercharger — Vacaville, CA, 95688 (Tesla · DC Fast · 250 kW)
  7. Vacaville Commons Shopping Center - Tesla Supercharger — Vacaville, CA, 95687 (Tesla · DC Fast · 250 kW)
  8. Vacaville Premium Outlets - Tesla Supercharger — Vacaville, CA, 95687 (Tesla · DC Fast · 150 kW)
  9. GF4EVA NUGGET DC2 — Vacaville, CA, 95688 (ChargePoint Network · DC Fast · 62.5 kW)
  10. GF4EVA NUGGET DC1 — Vacaville, CA, 95688 (ChargePoint Network · DC Fast · 62.5 kW)
  11. Vacaville Premium Outlets North — Vacaville, CA, 95687 (eVgo Network · DC Fast · 50 kW)
  12. 770 MASON L1 — Vacaville, CA, 95688 (ChargePoint Network · Level 2 · 19.2 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Vacaville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 11 DC fast and 35 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Vacaville, California?
There are 46 public electric vehicle charging locations in Vacaville, California, with a combined 171 individual chargers. 11 locations offer DC fast charging and 35 provide Level 2 charging.
What is the largest EV charging network in Vacaville?
ChargePoint Network operates the most public charging locations in Vacaville with 25 sites, followed by Non-Networked with 10 sites.
How much does it cost to install an EV charger in Vacaville?
Level 2 EV chargers in Vacaville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Vacaville?
Most Vacaville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Vacaville?
A typical commercial Level 2 installation in Vacaville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Vacaville take to become profitable?
Payback in Vacaville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.